Condition Details / Information Notes |
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents:
- 23:90:00 Site Location Plan Rev E
- 23:90:02 Proposed Block Plan Rev E
- 23:90:03 Proposed Ground Floor
- 23:90:04 Proposed First Floor Rev B
- 23:90:05 Proposed Elevation To South-West
- 23:90:06 Proposed Elevation To South-East
- 23:90:07 Proposed Elevation To North-East
- 23:90:08 Proposed Elevation To North-West
- 23:90:09 Proposed Demolitions Plan.
Reason: To define the permission. |
The occupation of the dwelling/mobile unit hereby permitted shall be limited to a person solely or mainly working, or last working (and not working elsewhere in the meantime), in the locality in agriculture (as defined in Section 336(1) of the Town and Country Planning Act, 1990) or in forestry (“the Agricultural Worker”), or a widow, widower or surviving civil partner of the Agricultural Worker, and to any dependants residing with the Agricultural Worker or his/her widow, widower or surviving civil partner.
Reason: The proposed dwelling would be situated in the open countryside, outside any defined settlement boundary where new housing development will be strictly controlled. The proposed dwelling is justified as it serve the essential needs of an agricultural operation in line with policy SWDP19 of the South Worcestershire Development Plan. To grant permission without such a condition would be contrary to policies SWDP2 and SWDP19 of the South Worcestershire Development Plan . |
No building operations hereby permitted shall commence until details of the materials to be used in the construction of the external surfaces of the dwelling hereby permitted have been submitted to and approved in writing by the local planning authority. The details to be submitted shall include:-
- type, colour, texture, size, coursing, finish, jointing and pointing of brickwork/stonework;
- type, colour, texture, size and design of roofing materials.
The development shall be carried out using the materials as approved.
Reason: To ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with policy SWDP21 of the South Worcestershire Development Plan.
|
Before the first use/occupation of the development hereby permitted a scheme of landscaping shall be submitted to and approved in writing by the Local Planning Authority. The landscaping scheme shall include:-
(i) a plan(s) showing details of all existing trees and hedges on the application site. The plan should include, for each tree/hedge, the accurate position, canopy spread and species, together with an indication of any proposals for felling/pruning and any proposed changes in ground level, or other works to be carried out, within the canopy spread.
(ii) a plan(s) showing the layout of proposed tree, hedge and shrub planting and grass areas.
(iii) a schedule of proposed planting - indicating species, sizes at time of planting and numbers/densities of plants.
(iv) a written specification outlining cultivation and other operations associated with plant and grass establishment.
(v) a schedule of maintenance, including watering and the control of competitive weed growth, for a minimum period of five years from first planting.
All planting and seeding/turfing shall be carried out in accordance with the approved details in the first planting and seeding/turfing seasons following the completion or first occupation/use of the development, whichever is the sooner.
The planting shall be maintained in accordance with the approved schedule of maintenance. Any trees or plants which, within a period of five years from the completion of the planting, die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species.
Reason: To ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDP21 and SWDP25 of South Worcestershire Development Plan. |
Before the first use/occupation of the development hereby permitted a plan indicating the positions, design, materials and type of boundary treatment to be erected shall be submitted to and approved in writing by the local planning authority The boundary treatment shall be completed before the first use/occupation of the development hereby permitted or in accordance with a timetable agreed in writing by the local planning authority. Development shall be carried out in accordance with the approved details and shall thereafter be maintained as such.
Reason: To protect the amenities of properties and ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDP21 and SWDP25 of South Worcestershire Development Plan. |
Notwithstanding the submitted details, prior to the occupation of any part of the development hereby permitted details of renewable or low carbon energy generating facilities to be incorporated as part of the development shall be submitted to and approved in writing by the local planning authority. The details shall demonstrate that at least 10% of the predicted energy requirements of the development will be met through the use of renewable/low carbon energy generating facilities. The approved facilities shall be provided prior to any part of the development hereby permitted being first occupied or in accordance with a timetable submitted to and approved by the local planning authority as part of the details required by this condition.
Reason: To ensure the proposed development includes sufficient renewable/low carbon energy generating facilities to comply with Policy 27 of the South Worcestershire Development Plan 2016. |
Prior to the first occupation of any of the dwellings hereby approved, details of superfast broadband facilities or alternative solutions to serve the dwellings hereby approved shall be submitted to and approved in writing by the local planning authority. The submitted details shall include an implementation programme. The facilities shall be provided in accordance with the approved details.
Reason: To ensure the proposal incorporates satisfactory telecommunication facilities in line with policy SWDP26 of the South Worcestershire Development Plan 2016.
|
Prior to the first use/occupation of the development hereby permitted, the details set out in the submitted Water Management Statement shall be fully implemented and remain thereafter.
Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development in accordance with policy SWDP29 of the South Worcestershire Development Plan 2016. |
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any order revoking, re-enacting, substituting, amending, extending, consolidating, replacing or modifying that Order), no (restricted works)(additions, extensions or external alterations) (new windows or other openings) (building or enclosure, swimming or other pool required for a purpose incidental to the enjoyment of the dwelling house) [other than those expressly authorised by this permission] shall be constructed/carried out on the application site following the completion/first use of the development hereby permitted.
Reason: To ensure the scale of the development is appropriate to the function as a rural workers dwelling and in the interests of the visual amenities and landscape character of the area and to comply with policies SWDP2, SWDP19, SWDP21 and SWDP25 of the South Worcestershire Development Plan. |
The Development hereby approved shall not be brought into use until the access, parking and turning facilities have been provided as shown on drawing 23:90:02 Proposed Block Plan Rev E.
Reason: To ensure conformity with summited details and in the interests of highways safety to comply with Policy SWDP21 of the South Worcestershire Development Plan. |
Before the commencement of development hereby permitted an ecological mitigation and enhancement scheme shall be submitted to and approved in writing by the local planning authority. The scheme shall be based on the recommendations contained within the Bat Survey report by Focus Ecology dated August 2023 and shall include an implementation timetable. The works shall thereafter be carried out in accordance with the approved details and timetable.
Reason: To ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDP22 of the South Worcestershire Development Plan. |
Positive and Proactive Statement. No problems have arisen in dealing with this application. The planning application sought an acceptable form of development consistent with the requirements of relevant policies and material considerations. No amendments or alterations were therefore required and no further positive or proactive action was deemed necessary. |
The applicant is required to observe the following obligations:
If vehicular access to the site is via the public right of way, it should be noted that under section 34 of the Road Traffic Act 1988, any person who, without lawful authority, drives a motor vehicle on a public right of way commits an offence. The applicant should make themselves satisfied that they, and anyone else who may use public rights of way for private vehicular access in connection with the development, has a right to do so. They may wish to seek legal advice on the matter. The County Council is responsible for maintaining rights of way to a
standard suitable for their usual public use.
No disturbance of, or change to, the surface of the path or part thereof should be carried out without our written consent.
No diminution in the width of the right of way available for use by the public.
Building materials must not be stored on the right of way.
Vehicle movements and parking to be arranged so vehicles do not unreasonably interfere with the public’s use of the right of way.
No additional barriers are placed across the right of way. No stile, gate, fence or other structure should be created on, or across, a public right of way without written consent of the Highway Authority.
The safety of the public using the right of way is to be ensured at all times.
The applicant should note the National Planning Policy Framework, last updated 5th September 2023 by the Ministry of Housing, Communities and Local Government, particularly paragraph 100, ‘…planning policies and decisions should protect and enhance public rights of way and access, including taking opportunities to provide better facilities for users, for example by adding links to existing rights of way
networks including National Trails’.
The developer should also be aware of the Department of Environment Circular 1/09 (part 7) which explains that the effect of development on a public right of way is a material consideration in the determination of applications for planning permission and that the grant of planning consent does not entitle developers to obstruct a public right of way.
The Definitive Map is a minimum record of public rights of way and does not preclude the possibility that unrecorded public rights may exist, nor that higher rights may exist than those shown. |