Application Number M/26/00897/FUL
Status Application Approved

Sign up to notifications on this planning application Back to search results New search

Planning Online Status


  • Application
    Valid
    18/06/2026
  • Consultation
    End
    14/07/2026
  • Committee
    Meeting
    N/A
  • Decision

    Approval
  • Decision
    Date
    19/08/2026
  • Appeal
    Started
    N/A
  • Appeal
    Decision
    N/A
Summary
Application Number M/26/00897/FUL
Location Address Hope Barn Clifton Upon Teme Worcester WR6 6HJ
Proposal Outdoor riding arena with timber post and rail fencing, sand and fibre riding surface for personal use
Status Approval
Application Type Full planning permission
Appeal Decision N/A

Important Dates
Application Received Date 10/06/2026
Application Valid Date 18/06/2026
Consultation Start Date 23/06/2026
Site Visited / Site Notice Date
Consultation End 14/07/2026
Advert Expiry
Committee Date (if applicable)
Committee Agenda
Decision Date 19/08/2026

Further Information
Expected Decision Level Delegated
Case Officer Hayley Jones
Parish Clifton upon Teme CP
Ward Baldwin Ward
Applicant Ms Ali Taylor
Agent Mr Neil Reid-Warrilow, Pegasus Equestrian Construction Ltd
Agent Address Western Way Braodaxe Business Park Presteigne LD8 2UH

Condition Details / Information Notes
The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents – Location plan, Amended Block Plan, PEG 005, 005 & 007. Reason: To define the permission in accordance with policies SWDPR01 and SWDPR03 of the South Worcestershire Development Plan Review 2026 and the National Planning Policy Framework.
Prior to the first use/occupation of the development hereby permitted, the details set out in the submitted Water Management Statement shall be fully implemented and remain thereafter. Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development in accordance with policy SWDPR 39 of the South Worcestershire Development Plan Review 2026.
The development hereby permitted shall be carried out in strict accordance with the mitigation, compensation and enhancement recommendations for protected species set out in the Preliminary Ecological Appraisal and Biodiversity Net Gain Assessment report produced by Aware Ecology dated 28/05/2026 and submitted with this application. Reason – To ensure that the proposed development contributes to the conservation and enhancement of biodiversity within the site and for the wider area in accordance with policies SWDPR01 and SWDP29 of the South Worcestershire Development Plan Review 2021 - 2041 (2026) and to to ensure compliance with the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2017
Prior to the commencement of development hereby approved, a landscape and ecological management plan (LEMP) shall be submitted to and agreed in writing by the Local Planning Authority. The content of the LEMP and shall be guided by the requirement to achieve Biodiversity Net Gain and maintain this after implementation, and, at a minimum, must cover the following: a. Landscape and ecological aims and objectives of management b. Description and evaluation of the landscape and ecological features to be managed (both existing and proposed); c. Ecological trends and constraints on site that might influence management; d. Appropriate management options for achieving aims and objectives; e. A maintenance schedule for the first 5-year establishment period, and an annual work plan for on-going management capable of being rolled forward for a minimum of 30 years thereafter; f. Details (type and location) of any wildlife boxes and hibernacula g. Details of the body or organisation responsible for implementation of the plan; h. On-going monitoring and remedial measures. The plan shall also set out where the results of the monitoring show that both landscape and conservation aims and objectives of the LEMP are not being met, how contingencies and/or remedial action identified, agreed and implemented so that the development still delivers the fully functioning biodiversity objectives of the originally approved scheme. The LEMP will be implemented in accordance with the approved details. Reason: To ensure that the proposed development contributes to the conservation and enhancement of biodiversity within the site, and to ensure the proposal harmonises with the surroundings in accordance with policies SWDPR 28, SWDPR 29, SWDPR30 and SWDPR 34 of the South Worcestershire Development Plan Review 2021 -2041 (2026).
Notwithstanding the submitted plans and details, no external lighting, including floodlighting, security lighting, or any other form of artificial external illumination, shall be installed, erected, or operated within the application site unless and until full details of a proposed external lighting scheme have first been submitted to and approved in writing by the Local Planning Authority Reason: In order to safeguard the character and appearance of the surrounding landscape, in accordance with Policy SWDPR34; and to protect the amenity of nearby residential occupiers from light pollution, glare, and disturbance, in accordance with Policy SWDPR35.
Positive and Proactive Statement. No problems have arisen in dealing with this application. The planning application sought an acceptable form of development consistent with the requirements of relevant policies and material considerations. No amendments or alterations were therefore required and no further positive or proactive action was deemed necessary.
The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition “(the biodiversity gain condition”) that development may not begin unless: - A Biodiversity Gain Plan has been submitted to the planning authority; and - The planning authority has approved the plan. Subject to Paragraph 14(2) of Schedule 7A of the Town and Country Planning Act 1990, the biodiversity gain plan must include: a) Information about the steps taken or to be taken to minimise the adverse effect of the development on the biodiversity of the onsite habitat and any other habitat; b) Completed metric tool calculation; c) The pre-development biodiversity plan and value of the onsite habitat; d) The post-development biodiversity plan and value of the onsite habitat; e) Any registered offsite biodiversity gain allocated to the development, including register reference numbers, and the biodiversity value of that gain in relation to the development; f) Proof of purchase for any biodiversity credits purchased for the development; and g) Any such other matters as the Secretary of State may by regulations specify. Advice about how to prepare a Biodiversity Gain Plan and a template can be found at: https://www.gov.uk/guidance/submit-a-biodiversity-gain-plan.

Copyright Notice

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Tick here to show you have read and agree with the Copyright Notice.

Document Download Tips

  • In order to view the documents please ensure you have ticked the Copyright Notice box above.
  • In order to view PDF documents, you will need to have the free Adobe Acrobat Reader software installed on your computer. Click here to download.
  • To view individual documents click on the 'Document Type' on the row you require and the document will open as an Adobe Acrobat pdf.
  • To download multiple documents in one go, tick all the boxes relating to the documents you wish to view and click Download selected files button.
  • If you wish to download ALL documents place a tick in the box in the header row and click 'Download Selected Files' button.
  • Note: some devices such as iPads that use iOS browsers do not have the standard capability to download multiple files as a default function. If you are experiencing difficulties you may need to download a free application to enable you to do this - known as a zip file. Go to the AppStore to download a zip file ‘app’.

How to reorder or group rows

Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.

Document Type Date Description File Size Drawing/Rev Number
Application Documents
Biodiversity Net Gain
Application Plans
Statutory Consultee Response
Decision

Consultation Responses

Neighbour List


In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.


Address Sent Reply Received
Hope Barn Cottage Clifton Upon Teme WORCESTER WR6 6HJ 23/06/2026

Consultee List


Name Organisation Sent Reply Due Reply Received
Andrew Ward Clifton upon Teme Parish Council 23/06/2026 14/07/2026
Cllr Pam Cumming Baldwin Ward 23/06/2026 14/07/2026
Cllr Paul Cumming Baldwin Ward 23/06/2026 14/07/2026
Drainage Engineer Engineers - S.W. Land Drainage Partnership 23/06/2026 14/07/2026
Highways County Highways 23/06/2026 14/07/2026
MHDC Natural Heritage & Biodiversity Officer MHDC Natural Heritage & Biodiversity 23/06/2026 14/07/2026
Worcestershire Regulatory Services - Nuisance Worcestershire Regulatory Services 23/06/2026 14/07/2026

Constraints List


Constraints List
CIL009 - Non-Urban Area
Area of Special Control of Advertisements
Interferometer Area. Clee Hill - Consultation required for any building structure or works exceeding 45.7m in height above ground level
Outside SWDP Development Boundary
Water Supply. If Major Application consultation required with Water Supply Company
Pre-SWDPR - SWDP 15: Designated Rural Areas
Pre-SWDPR - SWDP 5: Protect and Enhance
SWDPR 19: Designated Rural Areas-Meeting Affordable Housing Needs
SWDPR South Worcestershire Boundary: Malvern Hills District Council
SWDPR 29: Malvern Hills SSSI Mitigation Strategy Zone of Influence
Neighbourhood Plan: NPA Boundaries - Clifton upon Teme. Adopted: 28/11/2017
Paper: Berrows Journal - Thursday
No associated appeals