| Condition Details / Information Notes |
| The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents –
2399 1000 Location and Block Plan REVISION C
2399 3000 Barn Proposed Layouts REVISION C
Reason: To define the permission in accordance with policies SWDPR01 and SWDPR03 of the South Worcestershire Development Plan Review 2026 and the National Planning Policy Framework. |
| Prior to their installation as part of the development hereby permitted details of the materials to be used in the construction of the external surfaces of the extension hereby permitted shall be submitted to and approved in writing by the local planning authority. The details to be submitted shall include:
- detailed specification of the new timber cladding showing the dimensions, profile and a description of the stain or paint finish to be applied to the boarding.
Reason: To protect, conserve and enhance the significance of heritage assets and to ensure that the new materials are in keeping with the surroundings and represent quality design in accordance with policies SWDR05, SWDPR09, SWDPR28 and SWDPR33 of the South Worcestershire Development Plan Review 2026. |
| Prior to the first use/occupation of the development hereby permitted, the details set out in the submitted Water Management Statement shall be fully implemented and remain thereafter.
Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development in accordance with policy SWDPR39 of the South Worcestershire Development Plan Review 2026. |
| Prior to the first use / occupation of the development hereby approved, either a bat box (e.g. Ibstock enclosed bat box, Habibat bat box, Schwegler Wall-mounted Bat Shelter 2FE, Schwegler 2F Bat Box) and/or a bird box ( e.g. sparrow terrace, Schwegler 1b, vivaro pro Seville, vivaro pro Barcelona) shall be installed within the land ownership of the site. There should be clear flight path to the box without any clutter directly in front of the entrance. Bat boxes should be installed at least 4m above ground-level, facing south (or southwest/southeast), and not placed above windows. Nest boxes for tits, sparrows or starlings should be fixed two to four metres up a tree or a wall. Open-fronted boxes for robins and wrens need to be low down, below 2m, well hidden in vegetation. Bird boxes should face between north and east to avoid strong sunlight.
Reason: To ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDPR29 of the South Worcestershire Development Plan Review 2026. |
| Positive and Proactive Statement. No problems have arisen in dealing with this application. The planning application sought an acceptable form of development consistent with the requirements of relevant policies and material considerations. No amendments or alterations were therefore required and no further positive or proactive action was deemed necessary. |
| Buildings, and particularly roofs and the spaces underneath them, are frequently used as roosting sites by bats. Bats and their 'roost' sites are protected under the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats & Species Regulations 2017 (as amended), the latter of which deems them a European Protected Species. It is a criminal offence to damage or destroy a roost (even if bats are not occupying the roost at the time), to deliberately kill or injure a bat, disturb a bat in its roost, or intentionally or recklessly obstruct access to a bat roost. Planning consent for a development does not provide a defence against prosecution under these acts.
Any removal of roof and wall coverings including roof tiles, slates, hanging tiles, timber boarding, soffit boxes and facia boards shall be carried out carefully by hand. If bats or any sign of bats such as an accumulation of droppings are encountered at any stage of work, work must cease immediately and advice sought from an appropriately licenced bat ecologist on how to proceed lawfully. All contractors working on site should be made aware of the advice and provided with the contact details of a relevant ecological consultant.
|