| Condition Details / Information Notes |
| The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents –E01; P01 (D); P02 (C); P04(D); P05(B); P06(B); P07(A); P08(B) P10(A); and P11(A). Design and Access Statement, 12 March 2026
Reason: To define the permission in accordance with policies SWDPR01 and SWDPR03 of the South Worcestershire Development Plan Review 2026 and the National Planning Policy Framework. |
| The development hereby permitted shall not be occupied/first used until full details of all surface water drainage systems to serve the development have been submitted to and approved in writing by the Local Planning Authority. The approved drainage works shall be implemented in accordance with the approved details before the first occupation/use of the development hereby permitted and shall be retained thereafter.
Reason: To ensure development does not exacerbate flood risk and deals with surface water run-off from the site in a sustainable manner, in accordance with policies SWDPR 38, SWDPR39 and SWDPR 40 of the South Worcestershire Development Plan Review 2026.
|
| No development shall take place until a percolation test has been carried out in accordance with BRE Digest 365, or such other equivalent guidance as may be agreed in writing by the Local Planning Authority. The results of the percolation test shall be submitted to and agreed in writing by the Local Planning Authority.
If the percolation test results show that ground conditions are unsuitable for some, or all,types of infiltration device then an alternative method of surface water disposal will need to be submitted for approval. The agreed recommendations shall be implemented in full prior to the first occupation of the development.
Reason: To ensure that the site can be adequately drained in accordance with policy SWDPR 39 of the South Worcestershire Development Plan Review 2026. |
| The development hereby permitted shall be carried out in strict accordance with the recommendations set out in the Preliminary Ecological Apprisal report carried out by Arbor Vitae dated 23 Febuary 2025.
Reason: To ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDPR29 of the South Worcestershire Development Plan Review 2026 |
| The development hereby approved shall be carried out in accordance with the submitted Tree Protection Plan (Drawing No. 3456-P12), and all tree protection measures identified therein shall be implemented and maintained throughout the construction period.
Reason: To ensure the protection and retention of existing trees and landscape features, in the interests of visual amenity and biodiversity, in accordance with Policies SWDPR29 and SWDPR34 of the South Worcestershire Development Plan |
| Prior to the occupation of the dwelling hereby approved, a landscape scheme shall be submitted and approved in writing by the local planning authority. The scheme shall include a scaled plan identifying: All proposed planting and boundary treatments, accompanied by a written specification setting out; species, size, quantity, density with cultivation details. Reason: To safeguard and enhance the character and amenity of the area in order to conform with policies SWDPR34 of the South Worcestershire Development Plan Review (2026) and the National Planning Policy Framework. |
| At no time shall any external lighting, except low power (under 550 Lumens/5 watts and <3000 Kelvin), ‘warm’ LED lighting in directional down-lighting luminaires on motion operated and time-limited switches be installed or operated in association with the approved development and no permanently illuminated external lighting shall be operated at any time, without the written approval of this local planning authority. Reason: To ensure that all species and local intrinsically dark landscape are protected having regard to Wildlife & Countryside Act (1981 amended); National Planning Policy Framework, and Policy SWDPR29 of the South Worcestershire Development Plan Review (2026) |
| Positive and Proactive Statement. No problems have arisen in dealing with this application. The planning application sought an acceptable form of development consistent with the requirements of relevant policies and material considerations. No amendments or alterations were therefore required and no further positive or proactive action was deemed necessary. |
| The Authority would advise the applicant (and their contractors) that they have a legal Duty of Care as regards wildlife protection. The majority of UK wildlife is subject to some level of legal protection through the Wildlife & Countryside Act (1981 as amended) and the Habitats and Species Regulations (2019 as amended), with enhanced protection for special “Higher Status Protected Species” such as all Bat species, Great Crested Newts, Otters, Dormice, Crayfish and reptile species that are present . All nesting birds are legally protected from disturbance at any time of the year. Care should be taken to plan work and at all times of the year undertake the necessary precautionary checks and develop relevant working methods prior to work commencing. If in any doubt it advised that advice from a local professional ecology consultant is obtained. If any protected species or other wildlife is found or disturbed during works then all works should stop and the site made safe until professional ecology advice and any required ‘licences’ have been obtained. Any additional lighting should fully respect locally dark landscapes and associated public amenity and nature conservation interests |