| Application Number | M/26/00226/HP |
| Status | Application Approved |
| Application Valid |
|---|
| 23/02/2026 |
| Consultation End |
|---|
| 19/04/2026 |
| Committee Meeting |
|---|
| N/A |
| Decision |
|---|
| Approval |
| Decision Date |
|---|
| 20/04/2026 |
| Appeal Started |
|---|
| N/A |
| Appeal Decision |
|---|
| N/A |
| Summary | |
| Application Number | M/26/00226/HP |
| Location Address | 2 Brook End Cottages Brookend Lane Kempsey Worcester WR5 3LF |
| Proposal | Erection of single storey extension and balcony. |
| Status | Approval |
| Application Type | Householder Planning |
| Appeal Decision | N/A |
| Important Dates | |
| Application Received Date | 13/02/2026 |
| Application Valid Date | 23/02/2026 |
| Consultation Start Date | 23/02/2026 |
| Site Visited / Site Notice Date | |
| Consultation End | 19/04/2026 |
| Advert Expiry | |
| Committee Date (if applicable) | |
| Committee Agenda | |
| Decision Date | 20/04/2026 |
| Further Information | |
| Expected Decision Level | Delegated |
| Case Officer | Matthew Webb |
| Parish | Kempsey CP |
| Ward | Kempsey Ward |
| Applicant | Mr Felix Aldersey |
| Agent | Matt Meeson, Glazzard Architects |
| Agent Address | Graingers Porcelain Works, Unit 9 St Martins Quarter Silver Street WORCESTER WR1 2DA |
| Condition Details / Information Notes |
| The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents – Location Plan – Dwg No. 2359 1000 Block Plan as Proposed – Dwg No. 2359 1010 Plans & Elevations As Existing – Dwg No. 2359 2000 Rev A Plans & Elevations As Proposed – Dwg No. 2359 3000 Rev A Reason: To define the permission in accordance with policies SWDPR01 and SWDPR03 of the South Worcestershire Development Plan Review 2026 and the National Planning Policy Framework. |
| Prior to the first use/occupation of the development hereby permitted, the details set out in the submitted Water Management Statement shall be fully implemented and remain thereafter. Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development in accordance with policy SWDPR 39 of the South Worcestershire Development Plan Review 2026. |
| Prior to the first use / occupation of the development hereby approved, either a bat box (e.g. Ibstock enclosed bat box, Habibat bat box, Schwegler Wall-mounted Bat Shelter 2FE, Schwegler 2F Bat Box) and/or a bird box ( e.g. sparrow terrace, Schwegler 1b, vivaro pro Seville, vivaro pro Barcelona) shall be installed within the land ownership of the site. There should be clear flight path to the box without any clutter directly in front of the entrance. Bat boxes should be installed at least 4m above ground-level, facing south (or southwest/southeast), and not placed above windows. Nest boxes for tits, sparrows or starlings should be fixed two to four metres up a tree or a wall. Open-fronted boxes for robins and wrens need to be low down, below 2m, well hidden in vegetation. Bird boxes should face between north and east to avoid strong sunlight. Reason: To ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDPR29 of the South Worcestershire Development Plan Review 2026. |
| The Development hereby approved shall not commence until a Construction Environmental Management Plan has been submitted to and approved in writing by the Local Planning Authority. This shall include but not be limited to the following:- • Measures to ensure that vehicles leaving the site do not deposit mud or other detritus on the public highway; • Details of site operative parking areas, material storage areas and the location of site operatives facilities (offices, toilets etc); • The hours that delivery vehicles will be permitted to arrive and depart, and arrangements for unloading and manoeuvring. • Details of any temporary construction accesses and their reinstatement. The measures set out in the approved Plan shall be carried out and complied with in full during the construction of the development hereby approved. Site operatives' parking, material storage and the positioning of operatives' facilities shall only take place on the site in locations approved by in writing by the local planning authority. Reason: To ensure the provision of adequate on-site facilities and in the interests of highway safety. |
| The Development hereby approved shall not be occupied until the first 5 metres of the access into the development, measured from the edge of the carriageway, has been surfaced in a bound material. REASON: In the interests of highway safety. |
| This permission does not authorise the applicant to carry out works within the publicly maintained highway since such works can only be carried out by the County Council’s Approved Contractor, Ringway Infrastructure Service who can be contacted by email worcestershirevehicle.crossing@ringway.co.uk The applicant is solely responsible for all costs associated with construction of the access. |
| Positive and Proactive Statement. No problems have arisen in dealing with this application. The planning application sought an acceptable form of development consistent with the requirements of relevant policies and material considerations. No amendments or alterations were therefore required and no further positive or proactive action was deemed necessary. |
Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.
Tick here to show you have read and agree with the Copyright Notice.
Document Download Tips
How to reorder or group rows
Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.
In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.
| Address | Sent | Reply Received |
|---|---|---|
| Norbury Hollow 23 Church Street Kempsey WORCESTER WR5 3JQ | 01/03/2026 | |
| 1 Brook End Cottages Brookend Lane Kempsey WORCESTER WR5 3LF | 23/02/2026 |
| Name | Organisation | Sent | Reply Due | Reply Received |
|---|---|---|---|---|
| Cllr D Harrison | Kempsey Ward | 23/02/2026 | 16/03/2026 | 26/02/2026 |
| Cllr J. Michael | Kempsey Ward | 23/02/2026 | 16/03/2026 | |
| Drainage Engineer | Engineers - S.W. Land Drainage Partnership | 23/02/2026 | 16/03/2026 | |
| Highways | County Highways | 23/02/2026 | 16/03/2026 | 24/02/2026 |
| Mrs S Dunn | Kempsey Parish Council | 23/02/2026 | 16/03/2026 |
| Constraints List |
| CIL009 - Non-Urban Area |
| Surface Water: 1 in 30 extent. |
| Surface Water: 1 in 1000 extent |
| Outside SWDP Development Boundary |
| Water Supply. If Major Application consultation required with Water Supply Company |
| SWDP 15: Designated Rural Areas |
| SWDP 5: Protect and Restore |
| Neighbourhood Plan: NPA Boundaries - Kempsey. Adopted: 28/11/2017 |
| Paper: Malvern Gazette - Friday |
| No associated appeals |