Application Number M/26/00163/FUL
Status Application Approved

Sign up to notifications on this planning application Back to search results New search

Planning Online Status


  • Application
    Valid
    06/02/2026
  • Consultation
    End
    19/03/2026
  • Committee
    Meeting
    N/A
  • Decision

    Approval
  • Decision
    Date
    30/06/2026
  • Appeal
    Started
    N/A
  • Appeal
    Decision
    N/A
Summary
Application Number M/26/00163/FUL
Location Address Puddleford Farm Eastham Tenbury Wells WR15 8NT
Proposal Change of use of land to residential garden, relocation of an existing outbuilding (summer house) and construction of an agricultural building (part retrospective)
Status Approval
Application Type Full planning permission
Appeal Decision N/A

Important Dates
Application Received Date 03/02/2026
Application Valid Date 06/02/2026
Consultation Start Date 17/02/2026
Site Visited / Site Notice Date
Consultation End 19/03/2026
Advert Expiry
Committee Date (if applicable)
Committee Agenda
Decision Date 30/06/2026

Further Information
Expected Decision Level Delegated
Case Officer Hayley Jones
Parish Eastham CP
Ward Tenbury Ward
Applicant Francesca Towle
Agent Mrs Eleni Marshall, Eldnar Ltd (Eldnar Consultancy)
Agent Address C/O Rose Cottage Edwyn Ralph Bromyard HR7 4LX

Condition Details / Information Notes
The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents – Location Plan SA54081 BRY 0011, Block Plan 0006 C, Proposed Elevations & Floorplan (Agricultural Building) 3786 & Summerhouse 3788 Reason: To define the permission in accordance with policies SWDPR01 and SWDPR03 of the South Worcestershire Development Plan Review 2026 and the National Planning Policy Framework.
The materials to be used in the construction of the external surfaces of the agricultural building hereby permitted shall be as specified in the application documents i.e. a steel portal frame, enclosed on all sides with plastisol coated steel sheeting and finished in dark green. Reason: To protect, conserve and enhance the significance of heritage assets and to ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with policies SWDR09, SWDPR05, SWDPR28 and SWDPR33 of the South Worcestershire Development Plan Review 2026.
The agricultural building hereby approved shall be used for storage in association with the surrounding agricultural land and for no other purpose, including domestic storage or any other purpose in Class C3 of the Schedule to the Town and Country Planning (Use Classes) Order 1987 (as amended), or in any provision equivalent to that Class in any statutory instrument revoking and re-enacting that Order with or without modification. Should the use of the building for the purposes of agriculture cease within ten years from the date on which the development was substantially completed, and planning permission has not been granted for a use other than agriculture, then the building must be removed from the land, and the land be restored to its condition before the development took place. This shall take place within three years from the date on which the use of the building has permanently ceased for agricultural purposes. You must notify the local planning authority, in writing and within seven days, of the date on which the development is substantially completed. Reason: The decision is made upon the basis that the development proposed would be sited upon agricultural land and would be reasonably necessary for the purposes of agriculture. If these circumstances do not apply, then the approved use must cease or seek planning permission. In order to accord with Policies SWDPR 02 and SWDPR 34 of the South Worcestershire Development Plan Review 2026 and Paragraphs 88 and 187 of the NPPF.
No development shall take place until an Ecological Mitigation, Compensation and Enhancement Scheme (EMCES) has been drawn up by a suitably qualified ecologist and submitted to and approved in writing by the local planning authority. The scheme shall be based on the recommendations made in the Preliminary Ecological Appraisal and Preliminary Roost Assessment report by Arbtech dated December 2025 and shall include: - Adoption of a Sensitive Lighting Scheme; - Reasonable Avoidance Measures for Nesting Birds; - Precautionary Working Method Statements for Herptiles, Badgers, Otters, Water Voles, Hedgehogs and Rabbits; - Details (including the models, specifications and locations where appropriate) of at least one bird box, at least one bat box and at least one log pile; - An Implementation timetable. The works shall thereafter be carried out in accordance with the approved details and timetable. Reason – To ensure that the proposed development contributes to the conservation and enhancement of biodiversity within the site and for the wider area in accordance with paragraphs 187 and 193 of the National Planning Policy Framework (NPPF) and to ensure compliance with the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2017.
No external lighting shall be provided other than the maximum of one external LED down-lighter above or beside each external door (and below eaves height) with a Corrected Colour Temperature not exceeding 2700K and brightness under 500 lumens. Every such light shall be directed downwards with a 0 degree tilt angle and 0% upward light ratio and shall be controlled by means of a PIR sensor with a maximum over-run time of 1 minute. The lighting shall be maintained thereafter in accordance with these details. Reason: To ensure that all species and local intrinsically dark landscape are protected having regard to The Conservation of Habitats and Species Regulations 2017, as amended by the Conservation of Habitats and Species (Amendment) (EU Exit) Regulations 2019’ (the ‘Habitats Regulations’), Wildlife & Countryside Act (1981 amended); National Planning Policy Framework, NERC Act (2006) and SWDPR 29 of the South Worcestershire Development Plan Review 2026.
Prior to the commencement of the development hereby approved, a Landscape and Ecological Management Plan (LEMP) shall be submitted to and agreed Prior to the commencement of the development hereby approved, a Landscape and Ecological Management Plan (LEMP) shall be submitted to and agreed in writing by the Local Planning Authority. The content of the LEMP shall be based on the approved Biodiversity Gain Plan, the recommendations made in the Biodiversity Net Gain Assessment report from Arbtech dated June 2026, the approved Landscaping Scheme and shall be maintained after implementation. It shall include the following: Details (type and location) of wildlife boxes and hedgehog highways; Description and evaluation of the features to be managed; Ecological trends and constraints on site that might influence management; Aims and objectives of management; Appropriate management options for achieving aims and objectives; Prescriptions for management actions; Preparation of a work schedule, including an annual work plan capable of being rolled forward over a five-year period and for a minimum of 30 years thereafter; Details of the body or organisation responsible for implementation of the plan; On-going monitoring and remedial measures. The plan shall also set out where the results of the monitoring show that conservation aims and objectives of the LEMP are not being met, how contingencies and/or remedial action identified, agreed and implemented so that the development still delivers the fully functioning biodiversity objectives of the originally approved scheme. The LEMP will be implemented in accordance with the approved details. Reason – To ensure that the proposed development contributes to the conservation and enhancement of biodiversity within the site and to ensure that the proposal harmonises with the surroundings in accordance with SWDPR 01, SWDPR05, SWDPR28, SWDPR 30 and SWDPR34 of the South Worcestershire Development Plan Review 2026
The approved Biodiversity Gain Plan required by paragraph 13 of Schedule 7A of the Town and Country Planning Act 1990 shall be implemented in accordance with the details and timescale agreed within the Plan and maintained thereafter in accordance with the approved Landscape and Ecological Management Plan (LEMP). Reason – To ensure that the proposed development delivers a biodiversity net gain in accordance with Schedule 7A of the Town and Country Planning Act 1990 and SWDPR 30 of the South Worcestershire Development Plan Review 2026.
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any order revoking, re-enacting, substituting, amending, extending, consolidating, replacing or modifying that Order), no building or enclosure, swimming or other pool required for a purpose incidental to the enjoyment of the dwelling house other than those expressly authorised by this permission shall be constructed/carried out on the application site. Reason: In the interests of the visual amenity and landscape character of the area in accordance with SWDPR 27 and SWDPR 34 of the South Worcestershire Development Plan Review.
The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition (“the biodiversity gain condition”) that development may not begin unless: - A Biodiversity Gain Plan has been submitted to the planning authority; and - The planning authority has approved the plan. Subject to Paragraph 14(2) of Schedule 7A of the Town and Country Planning Act 1990, the biodiversity gain plan must include: - Information about the steps taken or to be taken to minimise the adverse effect of the development on the biodiversity of the onsite habitat and any other habitat; - The pre-development biodiversity value of the onsite habitat; - The post-development biodiversity value of the onsite habitat; - Any registered offsite biodiversity gain allocated to the development and the biodiversity value of that gain in relation to the development; - Any biodiversity credits purchased for the development; and - Any such other matters as the Secretary of State may by regulations specify. Advice about how to prepare a Biodiversity Gain Plan and a template can be found at https://www.gov.uk/guidance/submit-a-biodiversity-gain-plan.
Positive and Proactive Statement. In dealing with this application, the Council has worked with the applicant in the following ways:- seeking further information following receipt of the application. In such ways the Council has demonstrated a positive and proactive manner in seeking solutions to problems arising in relation to the planning application.

Copyright Notice

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Tick here to show you have read and agree with the Copyright Notice.

Document Download Tips

  • In order to view the documents please ensure you have ticked the Copyright Notice box above.
  • In order to view PDF documents, you will need to have the free Adobe Acrobat Reader software installed on your computer. Click here to download.
  • To view individual documents click on the 'Document Type' on the row you require and the document will open as an Adobe Acrobat pdf.
  • To download multiple documents in one go, tick all the boxes relating to the documents you wish to view and click Download selected files button.
  • If you wish to download ALL documents place a tick in the box in the header row and click 'Download Selected Files' button.
  • Note: some devices such as iPads that use iOS browsers do not have the standard capability to download multiple files as a default function. If you are experiencing difficulties you may need to download a free application to enable you to do this - known as a zip file. Go to the AppStore to download a zip file ‘app’.

How to reorder or group rows

Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.

Document Type Date Description File Size Drawing/Rev Number
Application Documents
Biodiversity Net Gain
Application Plans
Neighbour and Other Response
Statutory Consultee Response
Decision

Consultation Responses

Neighbour List


In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.


Address Sent Reply Received
Walnut Barn Eastham TENBURY WELLS WR15 8NT 18/03/2026
Walnut Barn Eastham TENBURY WELLS WR15 8NT 19/03/2026
The Old Hall Lower Rochford TENBURY WELLS WR15 8NJ 17/02/2026

Consultee List


Name Organisation Sent Reply Due Reply Received
Aidan Smyth MHDC Archaeology & Planning Advisor 17/02/2026 10/03/2026
Cllr Duane Hubbard Tenbury Ward 17/02/2026 10/03/2026
Cllr Lesley Bruton Tenbury Ward 17/02/2026 10/03/2026
Consultation Service Natural England 17/02/2026 10/03/2026
Drainage Engineer Engineers - S.W. Land Drainage Partnership 17/02/2026 10/03/2026
Highways County Highways 17/02/2026 10/03/2026
MHDC Natural Heritage & Biodiversity Officer MHDC Natural Heritage & Biodiversity 17/02/2026 10/03/2026
Midlands Business Team Historic England 17/02/2026 10/03/2026
Ms Lesley Jenkins Eastham Parish Council 17/02/2026 10/03/2026
Worcester Regulatory Services Contaminated Land Worcestershire Regulatory Services 17/02/2026 10/03/2026

Constraints List


Constraints List
SWDP 15: Designated Rural Areas
Area of Special Control of Advertisements
Paper: Tenbury Advertiser - Thursday
SWDP 5: Protect and Enhance
Surface Water: 1 in 30 extent.
Surface Water: 1 in 100 extent.
Surface Water: 1 in 1000 extent
Interferometer Area. Clee Hill - Consultation required for any building structure or works exceeding 45.7m in height above ground level
Outside SWDP Development Boundary
CIL009 - Non-Urban Area
Contaminated Land
Policy Case HLA - MIG/06/01652/HOU. Puddleford Farm, Eastham, Tenbury Wells, WR15 8NT. Conversion of agricultural barn to dwelling. Amendments to 05/00743. Open Market. Small windfall (HLA only)
Listed Building Grade I or II* Only 25m buffer: Grade II*. H.E Ref: 1350031. Listed Building. Puddleford Farmhouse and adjoining Cider House and Hop Kilns. LB/1350031
Listed Buildings Affect Setting 25m Buffer - Grade II*. H.E Ref: 1350031. Listed Building. Puddleford Farmhouse and adjoining Cider House and Hop Kilns. LB/1350031
Site of Special Scientific Interest within 500m
No associated appeals