Application Number M/25/01147/FUL
Status Application Approved

Sign up to notifications on this planning application Back to search results New search

Planning Online Status


  • Application
    Valid
    31/07/2025
  • Consultation
    End
    12/09/2025
  • Committee
    Meeting
    N/A
  • Decision

    Approval
  • Decision
    Date
    16/12/2025
  • Appeal
    Started
    N/A
  • Appeal
    Decision
    N/A
Summary
Application Number M/25/01147/FUL
Location Address Three Counties Equine Hospital Llp Stratford Bridge Ripple Tewkesbury GL20 6HE
Proposal Erection of a new single storey CT Scanner facility to adjoin an existing MRI facility on site, extension to an existing single storey stable building, and the erection of a new single storey Isolation Stable building.
Status Approval
Application Type Full planning permission
Appeal Decision N/A

Important Dates
Application Received Date 22/07/2025
Application Valid Date 31/07/2025
Consultation Start Date 01/08/2025
Site Visited / Site Notice Date
Consultation End 12/09/2025
Advert Expiry
Committee Date (if applicable)
Committee Agenda
Decision Date 16/12/2025

Further Information
Expected Decision Level Delegated
Case Officer Jivan Manku
Parish Ripple CP
Ward Upton & Ripple Ward
Applicant Mr Mark Georgetti, Three Counties Equine Hospital
Agent Mr Joel Mann, Atkins Réalis
Agent Address 3100 Century Way Thorpe Park Leeds LS15 8ZB

Condition Details / Information Notes
The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans - 100116050-ATRL- XX- Z0-D-A-021001 P06 - 100116050-ATRL-XX-Z0-D-A-021002 P06 - 100116050-ATRL-XX-Z0-D-A-021003 P07 - 100116050-ATRL-XX-ZZ-D-A-011003 P04 - 100116050-ATRL-XX-ZZ-D-A-011004 P04 - 100116050-ATRL-XX-ZZ-D-A-011005 P04 - 100116050-ATRL-XX-ZZ-D-A-012003 P04 - 100116050-ATRL-XX-ZZ-D-A-012004 P04 - 100116050 ATRL-XX-ZZ-D-A-012005 P04 Reason: To define the permission.
Demolition, clearance or construction work and deliveries to and from the site in connection with the development hereby approved shall only take place between the hours of 08.00 and 18.00hrs Monday to Friday and 08.00 and 13.00hrs on a Saturday. There shall be no demolition, clearance or construction work or deliveries to and from the site on Sundays or Bank Holidays. Reason - To preserve the amenities of the locality in accord with Policy SWDP21 of the South Worcestershire Development Plan.
The development hereby permitted shall be carried out in strict accordance with the recommendations set out in the Ecological Appraisal report carried out by Udall-Martin Associates Ltd., dated June 2025 and submitted with this application. In particular: - Adoption of a sensitive lighting scheme during the construction period; - Ensuring that nesting birds are not disturbed during vegetation clearance or building work; - Precautionary working measures for great crested newts; - Precautionary best practice measures for badgers; - The addition of compensatory nesting habitat with four house martin nest boxes and two swallow nest boxes on the extended buildings; - The enhancement of the site for birds via the installation of two general bird nesting boxes on retained trees; - The enhancement of the site for bats via installation of two bat boxes on retained trees. Details of the type and location of the chosen bat and bird boxes shall be submitted to and approved in writing by the local planning authority prior to the commencement of the development. The approved boxes shall be installed prior to the development hereby permitted first being used. Reason – To ensure that the proposed development contributes to the conservation and enhancement of biodiversity within the site and for the wider area in accordance with paragraphs 187 and 193 of the National Planning Policy Framework (NPPF) and to ensure compliance with the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2017.
The approved Biodiversity Gain Plan required by paragraph 13 of Schedule 7A of the Town and Country Planning Act 1990 shall be implemented in accordance with the details and timescale agreed within the plan and maintained thereafter in accordance with the approved Landscape and Ecological Management Plan (LEMP). Reason – To ensure that the proposed development delivers a biodiversity net gain in accordance with Schedule 7A of the Town and Country Planning Act 1990 and SWDP 22 of the South Worcestershire Development Plan 2016.
Prior to the commencement of the development hereby approved, a Landscape & Ecological Management Plan (LEMP) shall be submitted to and approved in writing by the local planning authority. The content of the LEMP shall be based on the recommendations made in the Biodiversity Net Gain Design Stage Report from Udall-Martin Associates, dated June 2025, the approved landscaping scheme, informed by a Biodiversity Net Gain Assessment and associated metric calculations and shall maintain this after implementation. It shall include the following: - Description and evaluation of the features to be managed; - Ecological trends and constraints on site that might influence management; - Aims and objectives of management; - Appropriate management options for achieving aims and objectives; - Prescriptions for management actions; - Preparation of a work schedule, including an annual work plan capable of being rolled forward over a five-year period for a minimum of 30 years thereafter; - Details of the body or organisation responsible for implementation of the plan; - On-going monitoring and remedial measures. The plan shall also set out where the results of the monitoring show that conservation aims and objectives of the LEMP are not being met, how contingencies and/or remedial action identified, agreed and implemented so that the development still delivers the fully functioning biodiversity objectives of the originally approved scheme. The LEMP will be implemented in accordance with the approved details. Reason – To ensure that the proposed development contributes to the conservation and enhancement of biodiversity within the site and to ensure that the proposal harmonises with the surroundings in accordance with SWDP 21, SWDP 22 and SWDP 25 of the South Worcestershire Development Plan 2016.
Prior to the commencement of development hereby permitted, a Lighting Design Strategy for Biodiversity shall be submitted to and approved in writing by the local planning authority. The strategy shall be based on Guidance Note 08/23. Bats and Artificial Lighting at Night, by the Bat Conservation Trust and ILP, and shall: - Identify those areas/features on site that are particularly sensitive for nocturnal wildlife and that are likely to cause in or around their breeding sites and resting places or along important routes used to access key areas of their territory, for example, for foraging; and - Show how and where external lighting will be installed and impacts of internal light spill (through the provision of appropriate lighting contour plans and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent nocturnal animals from using their territory or having access to their breeding sites and resting places. This will include the provision of dark corridor conditions for retained trees and other commuting routes. All lighting shall be installed in accordance with the specifications and locations set out in the strategy, and these shall be maintained thereafter in accordance with the strategy. Under no circumstances should any other external lighting be installed without prior consent from the local planning authority. Reason – To ensure compliance with the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2017 and to minimise impacts on protected species in accordance with SWDP 22 of the South Worcestershire Development Plan 2016.
Prior to the first use/occupation of the development hereby permitted, the details set out in the submitted Water Management Statement shall be fully implemented and remain thereafter. Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development in accordance with policy SWDP29 of the South Worcestershire Development Plan 2016.
The Development hereby approved shall not commence until a Construction Environmental Management Plan has been submitted to and approved in writing by the Local Planning Authority. This shall include but not be limited to the following:- • Measures to ensure that vehicles leaving the site do not deposit mud or other detritus on the public highway; • Details of site operative parking areas, material storage areas and the location of site operatives facilities (offices, toilets etc); • The hours that delivery vehicles will be permitted to arrive and depart, and arrangements for unloading and manoeuvring. • Details of any temporary construction accesses and their reinstatement. The measures set out in the approved Plan shall be carried out and complied with in full during the construction of the development hereby approved. Site operatives' parking, material storage and the positioning of operatives' facilities shall only take place on the site in locations approved by in writing by the local planning authority. Reason: To ensure the provision of adequate on-site facilities and in the interests of highway safety.
The Development hereby approved shall not be brought into use until the proposed buildings and have been provided as shown on drawing 100116050-ATRL-XX-Z0-D-A-021003 Rev 07 (Proposed Site Plan). Reason: To ensure conformity with summited details.
Positive and Proactive Statement. No problems have arisen in dealing with this application. The planning application sought an acceptable form of development consistent with the requirements of relevant policies and material considerations. No amendments or alterations were therefore required and no further positive or proactive action was deemed necessary.
The effect of paragraph 13 of Schedule 7A of the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition (“the Biodiversity Gain Condition”) that development may not begin unless: - A Biodiversity Gain Plan has been submitted to the planning authority; and - The planning authority has approved the plan. Subject to Paragraph 14(2) of Schedule 7A of the Town and Country Planning Act 1990, the Biodiversity Gain Plan must include: - Information about the steps taken or to be taken to minimise the adverse effect of the development on the biodiversity of the on-site habitat; - The pre-development biodiversity value of the on-site habitat; - The post-development biodiversity value of the on-site habitat. Advice on how to prepare a Biodiversity Gain Plan, and a template, can be found at: https://www.gov.uk/guidance/submit-a-biodiversity-gain-plan
We require the rights of way to be open throughout the development construction where possible. However, if public safety demands a temporary closure, application should be made at least 8 weeks in advance to: The Public Rights of Way Mapping Team at countryside@worcestershire.gov.uk. If vehicular access to the site is via the public right of way, it should be noted that under section 34 of the Road Traffic Act 1988, any person who, without lawful authority, drives a motor vehicle on a public right of way commits an offence. The applicant should make themselves satisfied that they, and anyone else who may use public rights of way for private vehicular access in connection with the development, has a right to do so. They may wish to seek legal advice on the matter. The County Council is responsible for maintaining rights of way to a standard suitable for their usual public use. No disturbance of, or change to, the surface of the path or part thereof should be carried out without our written consent. No diminution in the width of the right of way available for use by the public. Building materials must not be stored on the right of way. Vehicle movements and parking to be arranged so vehicles do not unreasonably interfere with the public’s use of the right of way. No additional barriers are placed across the right of way. No stile, gate, fence or other structure should be created on, or across, a public right of way without written consent of the Highway Authority. The safety of the public using the right of way is to be ensured at all times. The National Planning Policy Framework by the Ministry of Housing, Communities and Local Government, particularly paragraph 104, states that planning policies protect and enhance public rights of way and access. The developer should also be aware of the Department of Environment Circular 1/09 (part 7) which explains that the effect of development on a public right of way is a material consideration in the determination of applications for planning permission and that the grant of planning consent does not entitle developers to obstruct a public right of way. The Definitive Map is a minimum record of public rights of way and does not preclude the possibility that unrecorded public rights may exist, nor that higher rights may exist than those shown.

Copyright Notice

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Tick here to show you have read and agree with the Copyright Notice.

Document Download Tips

  • In order to view the documents please ensure you have ticked the Copyright Notice box above.
  • In order to view PDF documents, you will need to have the free Adobe Acrobat Reader software installed on your computer. Click here to download.
  • To view individual documents click on the 'Document Type' on the row you require and the document will open as an Adobe Acrobat pdf.
  • To download multiple documents in one go, tick all the boxes relating to the documents you wish to view and click Download selected files button.
  • If you wish to download ALL documents place a tick in the box in the header row and click 'Download Selected Files' button.
  • Note: some devices such as iPads that use iOS browsers do not have the standard capability to download multiple files as a default function. If you are experiencing difficulties you may need to download a free application to enable you to do this - known as a zip file. Go to the AppStore to download a zip file ‘app’.

How to reorder or group rows

Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.

Document Type Date Description File Size Drawing/Rev Number
Application Documents
Biodiversity Net Gain
Application Plans
Statutory Consultee Response
Decision

Consultation Responses

Neighbour List


In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.


Address Sent Reply Received
Chase Veterinary Clinic School Lane Ripple TEWKESBURY GL20 6EU 01/08/2025
Envex Depot Tewkesbury Road Upton Upon Severn WORCESTER WR8 0PX 01/08/2025
Flat Adjacent Three Counties Equine Hospital Llp Stratford Bridge Ripple TEWKESBURY GL20 6HE 01/08/2025
Flat At Three Counties Equine Hospital Llp Stratford Bridge Ripple TEWKESBURY GL20 6HE 01/08/2025

Consultee List


Name Organisation Sent Reply Due Reply Received
Aidan Smyth MHDC Archaeology & Planning Advisor 01/08/2025 22/08/2025
Cllr J. Owenson Upton & Ripple Ward 01/08/2025 22/08/2025
Cllr M. Allen Upton & Ripple Ward 01/08/2025 22/08/2025
Drainage Engineer Engineers - S.W. Land Drainage Partnership 01/08/2025 22/08/2025
Highways County Highways 01/08/2025 22/08/2025
Jonathan Brierley The Open Spaces Society 01/08/2025 22/08/2025
Michelle Hinde Ripple Parish Council 01/08/2025 22/08/2025
Mrs Marianne Pomeroy Worcestershire County Council (Minerals) 01/08/2025 22/08/2025
Ramblers Association (Worcestershire Area) Ramblers Association (Worcestershire Area) 01/08/2025 22/08/2025
Worcestershire County Council (Footpaths) WCC - Footpaths 01/08/2025 22/08/2025

Constraints List


Constraints List
Paper: Malvern Gazette - Friday
Outside SWDP Development Boundary
CIL009 - Non-Urban Area
Minerals - Sand And Gravel
Water Supply. If Major Application consultation required with Severn Trent (Welsh Water if in Bockleton Parish)
SWDP 15: Designated Rural Areas
SWDP 5: Protect and Restore
SWDP 32: Sand and Gravel
Public Right of Way: Type- Footpath. Path No- RP-534 C
No associated appeals