| Condition Details / Information Notes |
| Unless where required or allowed by other conditions attached to this prior approval, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents –
- J008572-01- Revision A
- J008572-02- Revision A
- J008572-03- Revision A
- J008572-04
- J008572-11- Revision B
- J008572-12- Revision B
- J008572-13- Revision E
Reason: To define the permission. |
| No building operations hereby permitted shall commence until details of the materials to be used in the construction of the external surfaces of the dwelling hereby approved, have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.
Reason: In order to ensure that the new materials are in keeping with the surrounding area and represent quality design in accordance with Policy SWDP 21 of the South Worcestershire Development Plan (2016), the South Worcestershire Design Guide Supplementary Planning Document (2018) and the National Planning Policy Framework.
|
| No building operations hereby permitted shall commence until details of bat roosting features and bird nesting boxes, including their proposed location and an implementation timetable, have been submitted to and approved in writing by the Local Planning Authority. The roosting features and bird boxes shall be installed in accordance with the approved details prior to first occupation of the dwelling.
Reason: In order to ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with Policy SWDP 22 of the South Worcestershire Development Plan (2016) and the National Planning Policy Framework.
|
| In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported immediately to the Local Planning Authority. The applicant is advised to immediately seek the advice of an independent geo-environmental consultant experienced in contaminated land risk assessment, including intrusive investigations and remediation.
No further works should be undertaken in the areas of suspected contamination, other than that work required to be carried out as part of an approved remediation scheme, unless otherwise agreed by the Local Planning Authority, until requirements 1 to 4 below have been complied with:
1. Detailed site investigation and risk assessment must be undertaken by competent persons in accordance with the Environment Agency's 'Land Contamination: Risk Management' guidance and a written report of the findings produced. The risk assessment must be designed to assess the nature and extent of suspected contamination and approved by the Local Planning Authority prior to any further development taking place.
2. Where identified as necessary, a detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to identified receptors must be prepared and is subject to the approval of the Local Planning Authority in advance of undertaking. The remediation scheme must ensure that the site will not qualify as Contaminated Land under Part 2A Environmental Protection Act 1990 in relation to the intended use of the land after remediation.
3. The approved remediation scheme must be carried out in accordance with its terms prior to the re-commencement of any site works in the areas of suspected contamination, other than that work required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority.
4. Following completion of measures identified in the approved remediation scheme a verification report that demonstrates the effectiveness of the remediation carried out must be produced and is subject to the approval of the Local Planning Authority prior to the occupation of any buildings on site.
Reason: To ensure that the risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property, and ecosystems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with Policy SWDP 31 of the South Worcestershire Development Plan (2016) and Chapter 15 of the National Planning Policy Framework.
|
| Buildings, and particularly roofs and the spaces underneath them, are frequently used as roosting sites by bats. Bats and their 'roost' sites are protected under the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats & Species Regulations 2017 (as amended), the latter of which deems them a European Protected Species. It is a criminal offence to damage or destroy a roost (even if bats are not occupying the roost at the time), to deliberately kill or injure a bat, disturb a bat in its roost, or intentionally or recklessly obstruct access to a bat roost. Planning consent for a development does not provide a defence against prosecution under these acts. Any removal of roof and wall coverings including roof tiles, slates, hanging tiles, timber boarding, timber window frames, soffit boxes and fascia boards shall be carried out carefully by hand. If bats or any sign of bats such as an accumulation of droppings are encountered at any stage of work, work must cease immediately, and advice sought from an appropriately licenced bat ecologist on how to proceed lawfully. All contractors working on site should be made aware of the advice and provided with the contact details of a relevant ecological consultant.
The applicant is reminded that, under the Wildlife and Countryside Act 1981, as amended (section 1), it is an offence to remove, damage or destroy the nest of any wild bird while that nest is in use or being built. Planning consent for a development does not provide a defence against prosecution under this act. To avoid impact to nesting birds and infringement of the Wildlife and Countryside Act 1981, any works that might impact active bird nests should be undertaken outside of the bird nesting season (1st March– 31st August), although the nesting period may start before this and extend beyond it, in many cases. |