Application Number M/25/00545/OUT
Status Application Approved

Sign up to notifications on this planning application Back to search results New search

Planning Online Status


  • Application
    Valid
    17/04/2025
  • Consultation
    End
    10/10/2025
  • Committee
    Meeting
    N/A
  • Decision

    Approval
  • Decision
    Date
    20/05/2026
  • Appeal
    Started
    N/A
  • Appeal
    Decision
    N/A
Summary
Application Number M/25/00545/OUT
Location Address Land At (Os 7951 4035) Rear Of Lime Grove Welland
Proposal Outline application (including details of means of access, landscaping and layout) for the proposed erection of 4 no. bungalows as self or custom build homes
Status Approval
Application Type Outline Application
Appeal Decision N/A

Important Dates
Application Received Date 01/04/2025
Application Valid Date 17/04/2025
Consultation Start Date 22/04/2025
Site Visited / Site Notice Date
Consultation End 10/10/2025
Advert Expiry 10/10/2025
Committee Date (if applicable)
Committee Agenda
Decision Date 20/05/2026

Further Information
Expected Decision Level Delegated
Case Officer Jack Hanly
Parish Welland CP
Ward Castlemorton, Welland & Wells Ward
Applicant Redwood Health Care
Agent Mr Simon Rowles, Greenaway Planning Limited
Agent Address PO Box 937 Worcester WR4 4GS

Condition Details / Information Notes
Application for the approval of all reserved matters shall be made to the Local Planning Authority before the expiration of three years from the date of this permission. The development hereby permitted shall be begun before the expiration of two years from the date of approval of the last of the reserved matters to be approved. Reason - In accordance with the requirements of Section 92 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004
Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans– D01 Rev. G D02 Rev. B C01 Rev D D900 Rev C Reason: To define the permission.
No building operations above slab floor level shall commence on each plot until details of the materials to be used in the construction of the external surfaces of the proposed dwelling on that plot have been submitted to and approved in writing by the local planning authority. The details to be submitted shall include:- - type, colour, texture, size, coursing, finish, jointing and pointing of brickwork/stonework; - type, colour, texture, size and design of roofing materials; - type, colour, texture, size and design of windows, doors and rainwater goods. The development of each plot shall be carried out as approved. Reason - To ensure that the new materials are in keeping with the surroundings and represent quality design in accordance with policies SWDPR 05 and SWDPR 28 of the South Worcestershire Development Plan Review (2026) and the National Planning Policy Framework.
Approval of the details of appearance and scale (hereinafter called ""the reserved matters"") within each plot, shall be obtained from the Local Planning Authority in writing before any development on that plot is commenced. The development of each plot shall be carried out as approved. Reason: Required to be imposed pursuant to Section 92 of the Town and Country Planning Act 1990 (as amended) and to enable the Local Planning Authority to exercise proper control over these aspects of the development.
No building hereby permitted shall be occupied until the sustainable drainage/surface water drainage scheme and foul water drainage scheme for the site has been completed in accordance with the details shown on the approved plans/documents. The drainage schemes shall be managed and maintained thereafter in accordance with the approved management and maintenance plan submitted with the application. Reason: To ensure development would not result in unacceptable risk of pollution or harm to the environment and to ensure the proposed development does not exacerbate flood risk and deals with surface water run-off from the site in a sustainable manner, in accordance with policies SWDPR 38, SWDPR 39 and SWDPR 40 of the South Worcestershire Development Plan Review (2026) and Chapter 14 of the National Planning Policy Framework.
In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported immediately to the Local Planning Authority. The applicant is advised to immediately seek the advice of an independent geo-environmental consultant experienced in contaminated land risk assessment, including intrusive investigations and remediation. No further works should be undertaken in the areas of suspected contamination, other than that work required to be carried out as part of an approved remediation scheme, unless otherwise agreed by the Local Planning Authority, until requirements 1 to 4 below have been complied with: 1. Detailed site investigation and risk assessment must be undertaken by competent persons in accordance with the Environment Agency's 'Land Contamination: Risk Management' guidance and a written report of the findings produced. The risk assessment must be designed to assess the nature and extent of suspected contamination and approved by the Local Planning Authority prior to any further development taking place. 2. Where identified as necessary, a detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to identified receptors must be prepared and is subject to the approval of the Local Planning Authority in advance of undertaking. The remediation scheme must ensure that the site will not qualify as Contaminated Land under Part 2A Environmental Protection Act 1990 in relation to the intended use of the land after remediation. 3. The approved remediation scheme must be carried out in accordance with its terms prior to the re-commencement of any site works in the areas of suspected contamination, other than that work required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority. 4. Following completion of measures identified in the approved remediation scheme a verification report that demonstrates the effectiveness of the remediation carried out must be produced and is subject to the approval of the Local Planning Authority prior to the occupation of any buildings on site. Reason: To ensure that the risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property, and ecosystems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors, in accordance with policies SWDPR 05, SWDPR 11, SWDPR 29, SWDPR 35, SWDPR 40 and SWDPR 42 of the South Worcestershire Development Plan Review (2026) and Chapter 15 of the National Planning Policy Framework.
The Development hereby approved shall not be brought into use until the access, parking and turning facilities have been provided as shown on drawing 72131 D01 Rev G [Site Plan]. Reason: To ensure conformity with submitted details in the interests of ensuring highway and pedestrian safety in accordance with policies SWDPR 06 and SWDPR 28 of the South Worcestershire Development Plan Review (2026) and Chapter 9 of the National Planning Policy Framework.
Prior to the first occupation of any dwelling hereby approved secure parking for cycles to comply with the Council’s standards shall be provided within the curtilage of each dwelling and these facilities shall thereafter be retained for the parking of cycles only. Reason: To comply with the Council’s parking standards in accordance with policies SWDPR 06 and SWDPR 28 of the South Worcestershire Development Plan Review (2026) and Chapter 9 of the National Planning Policy Framework.
The Development hereby permitted shall not be brought into use until a speed reducing feature has been constructed at the entrance to the proposed site and has been provided in accordance with details which shall first be submitted to and approved in writing by the Local Planning Authority. Reason: In the interests of ensuring highway and pedestrian safety in accordance with policies SWDPR 06 and SWDPR 28 of the South Worcestershire Development Plan Review (2026) and Chapter 9 of the National Planning Policy Framework.
No development shall take place (including demolition, ground works, vegetation clearance) until a Construction and Environmental Management Plan for Biodiversity (CEMP: Biodiversity) has been submitted to and approved in writing by the local planning authority. The CEMP: Biodiversity shall be based on the recommendations made in the Preliminary Ecological Appraisal report, dated March 2025, and the Reptile Survey report and Mitigation Strategy, dated October 2025, both from BLADE and include the following: - Risk assessment of potentially damaging construction activities; - Identification of “biodiversity protection zones”; - Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during construction (may be provided as a set of method statements); - The location and timing of sensitive works to avoid harm to biodiversity features; - The times during construction when specialist ecologists need to be present on site to oversee works; - Responsible persons and lines of communication; - The role and responsibilities on site of an Ecological Clerk of Works (ECoW) or similarly competent person; - Use of protective fences, exclusion barriers and warning signs. The approved CEMP: Biodiversity shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details, unless otherwise agreed in writing by the local planning authority. Reason: To ensure that the proposed development contributes to the conservation and enhancement of biodiversity within the site and for the wider area in accordance with policies SWDPR 01 and SWDPR 29 of the South Worcestershire Development Plan Review (2026) and paragraphs 187 and 193 of the National Planning Policy Framework (NPPF), and to ensure compliance with the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2017.
No development shall take place until an Ecological Design Strategy (EDS) addressing compensation and enhancement measures for protected species has been submitted to and approved in writing by the Local Planning Authority. The EDS shall include the following: - Purpose and conservation objectives for the proposed works; - Review of site potential and constraints; - Detail design(s) and/or working methods to achieve stated objectives; - Extent and location/area of proposed works on appropriate scale maps and plans; - Type and source of materials to be used where appropriate, e.g. native species of local provenance; - Timetable for implementation demonstrating that works are aligned with the proposed phasing of development; - Persons responsible for implementing the works; - Details of initial aftercare and long-term maintenance; - Details for monitoring and remedial measures; - Details for disposal of any wastes arising from works. The EDS shall be implemented in accordance with the approved details and all features shall be retained in that manner thereafter. Reason: To ensure that the development contributes to the conservation and enhancement of biodiversity in accordance with policies SWDPR 01 and SWDPR 29 of the South Worcestershire Development Plan Review (2026) and paragraphs 187, 192 and 193 of the National Planning Policy Framework (NPPF).
Prior to the commencement of the development hereby approved, a Landscape and Ecological Management Plan (LEMP) shall be submitted to and approved in writing by the Local Planning Authority. The content of the LEMP shall be based on the recommendations made in the Biodiversity Enhancement Strategy Addendum from BLADE, dated October 2025 and the approved Landscaping Scheme and shall be maintained after implementation. It shall include the following: - Description and evaluation of the features to be managed; - Ecological trends and constraints on site that might influence management; - Aims and objectives of management; - Appropriate management options for achieving aims and objectives; - Prescriptions for management actions; - Preparation of a work schedule, including an annual work plan capable of being rolled forward over a five-year period and for a minimum of 30 years thereafter; - Details of the body or organisation responsible for implementation of the plan; - On-going monitoring and remedial measures. The plan shall also set out where the results of the monitoring show that conservation aims and objectives of the LEMP are not being met, how contingencies and/or remedial action identified, agreed and implemented so that the development still delivers the fully functioning biodiversity objectives of the originally approved scheme. The LEMP will be implemented in accordance with the approved details. Reason: To ensure that the proposed development contributes to the conservation and enhancement of biodiversity within the site and to ensure that the proposal harmonises with the surroundings in accordance with policies SWDPR 01, SWDPR 05, SWDPR 28, SWDPR 29 and SWDPR 34 of the South Worcestershire Development Plan Review (2026) and Chapter 15 of the National Planning Policy Framework.
The development shall not commence until a detailed Reptile Mitigation Strategy has been completed by a suitably qualified ecologist and has been submitted to and approved in writing by the Local Planning Authority. The Reptile Mitigation Strategy shall be based on, but not be limited to, the recommendations made in the Reptile Survey report from Blade Ecology, dated April 2025, and shall be implemented in strict accordance with the approved details and timetable. Details regarding the need for any pre-commencement survey or checks, translocations, enhancements to the receptor site and monitoring methodology of the translocated population must be agreed and approved within the strategy. Reason – To ensure that the proposed development complies with the Wildlife and Countryside Act 1981 (as amended) and contributes to the enhancement of the site and wider area in accordance with policies SWDPR 01 and SWDPR 29 of the South Worcestershire Development Plan Review (2026) and Chapter 15 of the National Planning Policy Framework.
Prior to the commencement of development hereby permitted, a Lighting Design Strategy for Biodiversity shall be submitted to and approved in writing by the Local Planning Authority. The strategy shall be based on Guidance Note 08/23. Bats and Artificial Lighting at Night, by the Bat Conservation Trust and ILP, and shall: - Identify those areas/features on site that are particularly sensitive for nocturnal wildlife and that are likely to cause disturbance in or around their breeding sites and resting places or along important routes used to access key areas of their territory, for example, for foraging; and - Show how and where external lighting will be installed and impacts of internal light spill (through the provision of appropriate lighting contour plans and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent nocturnal animals from using their territory or having access to their breeding sites and resting places. This will include the provision of dark corridor conditions for retained trees, hedgerows and other commuting routes. All lighting shall be installed in accordance with the specifications and locations set out in the strategy and these shall be maintained thereafter in accordance with the strategy. Under no circumstances should any other external lighting be installed without prior consent from the local planning authority. Reason: To ensure compliance with the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2017 and minimise impacts on protected species in accordance with policies SWDPR 01 and SWDPR 29 of the South Worcestershire Development Plan Review (2026) and Chapter 15 of the National Planning Policy Framework.
Demolition, clearance or construction work and deliveries to and from the site in connection with the development hereby approved shall only take place between the hours of 08.00 and 18.00hrs Monday to Friday and 08.00 and 13.00hrs on a Saturday. There shall be no demolition, clearance or construction work or deliveries to and from the site on Sundays or Bank Holidays. Reason: To preserve the amenities of the locality in accordance with policy SWDPR 35 of the South Worcestershire Development Plan Review (2026) and Chapter 12 of the National Planning Policy Framework.
Positive and Proactive Statement. No problems have arisen in dealing with this application. The planning application sought an acceptable form of development consistent with the requirements of relevant policies and material considerations. No amendments or alterations were therefore required and no further positive or proactive action was deemed necessary.
If any domestic Heat Pumps are to be installed the applicant should ensure that the recommendations of the 'Institute of Acoustics Briefing Note on Heat Pumps' https://www.ioa.org.uk/sites/default/files/briefing_note_-_heat_pumps_-_publication_11.pdf are taken into consideration.
The applicant should refer to the 'WRS Code of Best Practice for Demolition and Construction Sites' https://www.worcsregservices.gov.uk/media/raejo4k2/wrs-contractor-guidance-2nd-editionv- 1-0.pdf and ensure its recommendations are complied with.

Copyright Notice

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Tick here to show you have read and agree with the Copyright Notice.

Document Download Tips

  • In order to view the documents please ensure you have ticked the Copyright Notice box above.
  • In order to view PDF documents, you will need to have the free Adobe Acrobat Reader software installed on your computer. Click here to download.
  • To view individual documents click on the 'Document Type' on the row you require and the document will open as an Adobe Acrobat pdf.
  • To download multiple documents in one go, tick all the boxes relating to the documents you wish to view and click Download selected files button.
  • If you wish to download ALL documents place a tick in the box in the header row and click 'Download Selected Files' button.
  • Note: some devices such as iPads that use iOS browsers do not have the standard capability to download multiple files as a default function. If you are experiencing difficulties you may need to download a free application to enable you to do this - known as a zip file. Go to the AppStore to download a zip file ‘app’.

How to reorder or group rows

Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.

Document Type Date Description File Size Drawing/Rev Number
Application Documents
Biodiversity Net Gain
Application Plans
Neighbour and Other Response
Statutory Consultee Response
Decision
Planning Application Documents

Consultation Responses

Neighbour List


In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.


Address Sent Reply Received
Hillberry Castlemorton MALVERN WR13 6JA 19/05/2025
Hillberry Castlemorton MALVERN WR13 6JA 12/09/2025
Manor House Grange Road MALVERN WR14 3EY 13/01/2026
7 Barleycorn Fields Welland MALVERN WR13 6RT 22/04/2025 25/05/2025
10 Barleycorn Fields Welland MALVERN WR13 6RT 22/04/2025 26/05/2025
14 Barleycorn Fields Welland MALVERN WR13 6RT 22/04/2025 19/05/2025
9 Barleycorn Fields Welland MALVERN WR13 6RT 22/04/2025 24/05/2025
8 Barleycorn Fields Welland MALVERN WR13 6RT 22/04/2025 10/05/2025
1 Barleycorn Fields Welland MALVERN WR13 6RT 22/04/2025
1 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
10 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
11 Barleycorn Fields Welland MALVERN WR13 6RT 22/04/2025
11 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
12 Barleycorn Fields Welland MALVERN WR13 6RT 22/04/2025
12 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
13 Barleycorn Fields Welland MALVERN WR13 6RT 22/04/2025
13 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
14 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
15 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
16 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
17 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
18 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
19 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
2 Barleycorn Fields Welland MALVERN WR13 6RT 22/04/2025
2 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
20 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
21 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
22 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
23 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
24 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
3 Barleycorn Fields Welland MALVERN WR13 6RT 22/04/2025
3 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
4 Barleycorn Fields Welland MALVERN WR13 6RT 22/04/2025
4 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
43 The Avenue Welland MALVERN WR13 6SB 22/04/2025
45 The Avenue Welland MALVERN WR13 6SB 22/04/2025
5 Barleycorn Fields Welland MALVERN WR13 6RT 22/04/2025
5 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
51 The Avenue Welland MALVERN WR13 6SB 22/04/2025
53 The Avenue Welland MALVERN WR13 6SB 22/04/2025
55 The Avenue Welland MALVERN WR13 6SB 22/04/2025
57 The Avenue Welland MALVERN WR13 6SB 22/04/2025
6 Barleycorn Fields Welland MALVERN WR13 6RT 22/04/2025
6 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
7 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
8 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
9 Cornfield Close Welland MALVERN WR13 6RS 22/04/2025
Flat At Welland House Care Centre Lime Grove Welland MALVERN WR13 6LY 22/04/2025
Milestone Cottage Marlbank Road Welland MALVERN WR13 6NE 22/04/2025
Mobile Home 1 Welland House Care Centre Lime Grove Welland MALVERN WR13 6LY 22/04/2025
Mobile Home 2 Welland House Care Centre Lime Grove Welland MALVERN WR13 6LY 22/04/2025
Welland House Care Centre Lime Grove Welland MALVERN WR13 6LY 22/04/2025
Welland Pavilion Marlbank Road Welland MALVERN WR13 6NE 22/04/2025
28 The Avenue Welland MALVERN WR13 6SB 22/04/2025 04/05/2025
30 The Avenue Welland MALVERN WR13 6SB 22/04/2025 12/05/2025

Consultee List


Name Organisation Sent Reply Due Reply Received
Defence Estates Safeguarding 22/04/2025 13/05/2025
Malvern Hills Trust 22/04/2025 13/05/2025
Aidan Smyth MHDC Archaeology & Planning Advisor 22/04/2025 13/05/2025
Asset Protection Team Severn Trent Water Limited 22/04/2025 13/05/2025
Catherine Laidlaw Malvern Hills National Landscape Partnership 22/04/2025 13/05/2025
Cllr Christine Wild Castlemorton, Welland & Wells Ward 22/04/2025 13/05/2025
Cllr John Gallagher Castlemorton, Welland & Wells Ward 22/04/2025 13/05/2025
Consultation Service Natural England 22/04/2025 13/05/2025
Drainage Engineer Engineers - S.W. Land Drainage Partnership 22/04/2025 13/05/2025
Environment Agency Environment Agency 22/04/2025 13/05/2025
Highways County Highways 22/04/2025 13/05/2025
MHDC Conservation Officer MHDC Development Plans & Conservation 22/04/2025 13/05/2025
MHDC Legal Services MHDC Legal Services 22/04/2025 13/05/2025
MHDC Natural Heritage & Biodiversity Officer MHDC Natural Heritage & Biodiversity 22/04/2025 13/05/2025
MHDC Tree and Landscape Officer MHDC Tree and Landscape Officer 22/04/2025 13/05/2025
Mr David Sharp Welland Parish Council 22/04/2025 13/05/2025
Sammie Lynch Policy Plans - Self Build 22/04/2025 13/05/2025
Worcester Regulatory Services Contaminated Land Worcestershire Regulatory Services 22/04/2025 13/05/2025
Worcestershire & Herefordshire LMC Ltd Local Medical Committee 22/04/2025 13/05/2025
Worcestershire Regulatory Services - Nuisance Worcestershire Regulatory Services 22/04/2025 13/05/2025
Worcestershire Wildlife Trust Worcestershire Wildlife Trust 22/04/2025 13/05/2025
Defence Estates Safeguarding 12/09/2025 03/10/2025
Malvern Hills Trust 12/09/2025 03/10/2025
Aidan Smyth MHDC Archaeology & Planning Advisor 12/09/2025 03/10/2025
Asset Protection Team Severn Trent Water Limited 12/09/2025 03/10/2025
Catherine Laidlaw Malvern Hills National Landscape Partnership 12/09/2025 03/10/2025
Cllr Christine Wild Castlemorton, Welland & Wells Ward 12/09/2025 03/10/2025
Cllr John Gallagher Castlemorton, Welland & Wells Ward 12/09/2025 03/10/2025
Consultation Service Natural England 12/09/2025 03/10/2025
Drainage Engineer Engineers - S.W. Land Drainage Partnership 12/09/2025 03/10/2025
Environment Agency Environment Agency 12/09/2025 03/10/2025
Highways County Highways 12/09/2025 03/10/2025
MHDC Conservation Officer MHDC Development Plans & Conservation 12/09/2025 03/10/2025
MHDC Legal Services MHDC Legal Services 12/09/2025 03/10/2025
MHDC Natural Heritage & Biodiversity Officer MHDC Natural Heritage & Biodiversity 12/09/2025 03/10/2025
MHDC Tree and Landscape Officer MHDC Tree and Landscape Officer 12/09/2025 03/10/2025
Mr David Sharp Welland Parish Council 12/09/2025 03/10/2025
Sammie Lynch Policy Plans - Self Build 12/09/2025 03/10/2025
Worcester Regulatory Services Contaminated Land Worcestershire Regulatory Services 12/09/2025 03/10/2025
Worcestershire & Herefordshire LMC Ltd Local Medical Committee 12/09/2025 03/10/2025
Worcestershire Regulatory Services - Nuisance Worcestershire Regulatory Services 12/09/2025 03/10/2025
Worcestershire Wildlife Trust Worcestershire Wildlife Trust 12/09/2025 03/10/2025

Constraints List


Constraints List
SWDP 2: Development Boundary
Malvern Hills National Landscape (Formerly Area of Outstanding Natural Beauty)
Neighbourhood Plan: Development Boundaries
SWDP 5: Protect and Enhance
s106: Land at Marlbank Road, Welland Ref No: S106-373
s106: Land at Marlbank Road Ref No: S106-373 VAR2
Paper: Malvern Gazette - Friday
Neighbourhood Plan: NPA Boundaries
s106: Land at Rear of Cornfield Close, Welland Ref No: S106-512
Neighbourhood Plan: Allocation
Surface Water: 1 in 1000 extent
Contamination Consult Area - Site Name: NULL Type: Historic landfill site
Interferometer Area. INFER/7022 -
Outside SWDP Development Boundary
s106: Land at Marlbank Road Ref No: S106-373 VAR1
Area of Special Control of Advertisements
CIL009 - Non-Urban Area
Water Supply. If Major Application consultation required with Severn Trent (Welsh Water if in Bockleton Parish)
Landfill Consultation - If Application is a Major (PS2 1-6) consultation required via E.A Checklist
Policy Case HLA - MIG/13/01388/HOU. Land at OS 7951, 4008, Off Marlbank Road, Welland WR13 6NE. Erection of 24 dwellings including 12 market and 12 affordable homes. Open Market. Large windfall (HLA only)
Policy Case HLA - MHDC/213/HOU. Land At (Os 7964 4028) Rear Of, Cornfield Close, Welland. Development of a Rural Exception Site for the erection of 14 dwellings (7 affordable dwellings to be cross-subsidised by 7 market dwellings)., . Affordable; Rural Exception. Large windfall (HLA only)
Policy Case HLA - MHDC/450/HOU. Land At (Os 7951 4035) Rear Of, Lime Grove, Welland, WR13 6LY. Permission in Principle for the proposed erection of 4 no. bungalows as self or custom build homes. Open Market. Small windfall (HLA only)
SWDP 23: Malvern Hills National Landscape (Formerly Area of Outstanding Natural Beauty)
SWDP 15: Designated Rural Areas
Surface Water: 1 in 100 extent.
Surface Water: 1 in 30 extent.
Listed Buildings Affect Setting 25m Buffer - Grade II. H.E Ref: 1098792. Listed Building. Milestone, A4104. LB/1098792
Local Wildlife Site within 100m: Welland Cemetery
Old Lowland Meadow area on or within 500m
Site of Special Scientific Interest within 500m
No associated appeals