| Condition Details / Information Notes |
| The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents:
- Field House Location Plan 06.05.2025
- Field House Existing Block Plan 06.05.2025
- Field House Proposed Block Plan 06.05.2025
- The Erection of Two Small Greenhouses- As Proposed- 19/04/2025
Reason: To define the permission. |
| Prior to the first use of the development hereby permitted, the details set out within the submitted Water Management Statement shall be fully implemented and retained thereafter.
Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development in accordance with Policy SWDP29 of the South Worcestershire Development Plan (2016) and Chapter 14 of the National Planning Policy Framework.
|
| The proposed development lies within an area that has been defined by the Mining Remediation Authority as containing coal mining features at surface or shallow depth. These features may include: mine entries (shafts and adits); shallow coal workings; geological features (fissures and break lines); mine gas and former surface mining sites. Although such features are seldom readily visible, they can often be present and problems can occur, particularly as a result of new development taking place.
Any form of development over or within the influencing distance of a mine entry can be dangerous and raises significant land stability and public safety risks. As a general precautionary principle, the Mining Remediation Authority considers that the building over or within the influencing distance of a mine entry should be avoided. In exceptional circumstance where this is unavoidable, expert advice must be sought to ensure a suitable engineering design which takes account of all relevant safety and environmental risk factors, including mine gas and mine-water. Your attention is drawn to the Mining Remediation Authority Policy in relation to new development and mine entries available at: Building on or within the influencing distance of mine entries - GOV.UK.
Any intrusive activities which disturb or enter any coal seams, coal mine workings or coal mine entries (shafts and adits) requires a Mining Remediation Authority Permit. Such activities could include site investigation boreholes, excavations for foundations, piling activities, other ground works and any subsequent treatment of coal mine workings and coal mine entries for ground stability purposes. Application forms for Mining Remediation Authority permission and further guidance can be obtained from The Mining Remediation Authority’s website at: www.gov.uk/get-a-permit-to-deal-with-a-coal-mine-on-your-property.
In areas where shallow coal seams are present caution should be taken when carrying out any on site burning or heat focused activities.
If any future development has the potential to encounter coal seams which require excavating, for example excavation of building foundations, service trenches, development platforms, earthworks, non-coal mineral operations, an Incidental Coal Agreement will be required. Further information regarding Incidental Coal Agreements can be found here - https://www.gov.uk/government/publications/incidental-coal-agreement/guidance-notes-for-applicants-for-incidental-coal-agreements.
If any coal mining features are unexpectedly encountered during development, this should be reported immediately to the Mining Remediation Authority on 0800 288 4242. Further information is available on the Mining Remediation Authority website at: Mining Remediation Authority - GOV.UK. |
| Where possible, the definitive line of public rights of way should be kept open and available throughout the construction phase. However, if Public Safety demands a temporary closure, applications should be made at least 8 weeks in advance to: The Public Rights of Way Mapping Team at prowclosures@worcestershire.gov.uk.
No disturbance of, or change to, the surface of the path or part thereof should be carried out without our written consent.
Under section 34 of the Road Traffic Act 1988, any person who, without lawful authority, drives a motor vehicle on a public right of way commits an offence. The applicant should make themselves satisfied that they, and anyone else who may use public rights of way for private vehicular access in connection with the development, has a right to do so. They may wish to seek legal advice on the matter. The County Council is responsible for maintaining rights of way to a standard suitable for their public use.
No diminution in the width of the right of way available for use by the public. Building materials must not be stored on the right of way. Vehicle movements and parking to be arranged so vehicles do not unreasonably interfere with the public’s use of the right of way.
No additional barriers are placed across the right of way. No stile, gate, fence or other structure should be created on, or across, a public right of way without written consent of the Highway Authority.
The safety of the public using the right of way is to be ensured at all times.
The National Planning Policy Framework by the Ministry of Housing, Communities and Local Government, particularly paragraph 105, states that planning policies should protect and enhance public rights of way and access.
The developer should also be aware of the Department of Environment Circular 1/09 (part 7) which explains that the effect of development on a public right of way is a material consideration in the determination of applications for planning permission and that the grant of planning consent does not entitle developers to obstruct a public right of way.
The Definitive Map is a minimum record of public rights of way and does not preclude the possibility that unrecorded public rights may exist, nor that higher rights may exist than those shown.
|
| Positive and Proactive Statement. No problems have arisen in dealing with this application. The planning application sought an acceptable form of development consistent with the requirements of relevant policies and material considerations. No amendments or alterations were therefore required and no further positive or proactive action was deemed necessary. |