| Application Number | M/25/00107/HP |
| Status | Application Approved |
| Application Valid |
|---|
| 27/01/2025 |
| Consultation End |
|---|
| 20/03/2025 |
| Committee Meeting |
|---|
| N/A |
| Decision |
|---|
| Approval |
| Decision Date |
|---|
| 21/03/2025 |
| Appeal Started |
|---|
| N/A |
| Appeal Decision |
|---|
| N/A |
| Summary | |
| Application Number | M/25/00107/HP |
| Location Address | 7 Christ Church Road Malvern WR14 3BH |
| Proposal | Rear wraparound extension with garden and ground floor elements |
| Status | Approval |
| Application Type | Householder Planning |
| Appeal Decision | N/A |
| Important Dates | |
| Application Received Date | 21/01/2025 |
| Application Valid Date | 27/01/2025 |
| Consultation Start Date | 28/01/2025 |
| Site Visited / Site Notice Date | |
| Consultation End | 20/03/2025 |
| Advert Expiry | 28/02/2025 |
| Committee Date (if applicable) | |
| Committee Agenda | |
| Decision Date | 21/03/2025 |
| Further Information | |
| Expected Decision Level | Delegated |
| Case Officer | Benjamin Sparrey |
| Parish | Malvern CP |
| Ward | Barnards Green Ward |
| Applicant | Mr Richard Longman |
| Agent | Mr James Bullock, Geomex Ltd |
| Agent Address | Red Robin Farm Sandlin Leigh Sinton Malvern WR13 5DN |
| Condition Details / Information Notes |
| The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents – Site Location & Block Plan Drawing No. 7CCRM-SLBP-JEBB Proposed Elevations Drawing No. 7CCRM-PE-JEBB Side North Elevation Drawing No. 7CCRM-SNE-JEBB Proposed Floor Plans Drawing No: 7CCRM-PFP-JEBB Proposed Block Plan Drawing No: 7CCRM-PBP-JEBB Reason: To define the permission. |
| Prior to the first use/occupation of the development hereby permitted, the details set out in the submitted Water Management Statement together with the inclusion of the rain water harvesting system shall be fully implemented and remain thereafter. Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development in accordance with policy SWDP29 of the South Worcestershire Development Plan 2016. |
| A bat box shall be installed within the land ownership of the site (e.g. Ibstock enclosed bat box, Habibat bat box, Schwegler Wall-mounted Bat Shelter 2FE, Schwegler 2F Bat Box). The box should be installed at least 4m above ground-level, and not placed above windows. The roosting feature shall be installed before the first use of any part of the development. Reason: To ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDP22 of the South Worcestershire Development Plan |
| (A) No development shall take place until a programme of archaeological work, including a Written Scheme of Investigation, has been submitted to and approved by the local planning authority in writing. The scheme shall include an assessment of significance and research questions; and: 1) The programme and methodology of site investigation and recording. 2) The programme for post investigation assessment. 3) Provision to be made for analysis of the site investigation and recording. 4) Provision to be made for publication and dissemination of the analysis and records of the site investigation. 5) Provision to be made for archive deposition of the analysis and records of the site investigation. 6) Nomination of a competent person or persons/organisation to undertake the works set out within the Written Scheme of Investigation. (B) The development shall not be occupied until the site investigation and post investigation assessment has been completed in accordance with the programme set out in the Written Scheme of Investigation approved under condition (A) and the provision made for analysis, publication and dissemination of results and archive deposition has been secured. Reason: In accordance with the requirements of paragraphs 207 and 218 of the National Planning Policy Framework (as amended) and SWDP 6 & 24 of the South Worcestershire Development Plan 2016. |
| Positive and Proactive Statement. In dealing with this application, the Council has worked with the applicant in the following ways: - seeking further information following receipt of the application. In such ways the Council has demonstrated a positive and proactive manner in seeking solutions to problems arising in relation to the planning application. |
Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.
Tick here to show you have read and agree with the Copyright Notice.
Document Download Tips
How to reorder or group rows
Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.
In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.
| Address | Sent | Reply Received |
|---|---|---|
| 10 Court Road MALVERN WR14 3BL | 28/01/2025 | |
| 9 Christ Church Road MALVERN WR14 3BH | 28/01/2025 | |
| 3 Court Gardens MALVERN WR14 3BF | 28/01/2025 | 08/02/2025 |
| 5 Christ Church Road MALVERN WR14 3BH | 28/01/2025 | 17/02/2025 |
| Name | Organisation | Sent | Reply Due | Reply Received |
|---|---|---|---|---|
| Cllr David Mead | Barnards Green Ward | 28/01/2025 | 18/02/2025 | |
| Cllr Malcolm Victory | Barnards Green Ward | 28/01/2025 | 18/02/2025 | |
| Cllr Mark Driscoll | Barnards Green Ward | 28/01/2025 | 18/02/2025 | |
| Drainage Engineer | Engineers - S.W. Land Drainage Partnership | 28/01/2025 | 18/02/2025 | 18/02/2025 |
| Highways | County Highways | 28/01/2025 | 18/02/2025 | |
| MHDC Conservation Officer | MHDC Development Plans & Conservation | 28/01/2025 | 18/02/2025 | 20/03/2025 |
| Town Council Clerk | Malvern Town Council | 28/01/2025 | 18/02/2025 | |
| Drainage Engineer | Engineers - S.W. Land Drainage Partnership | 14/03/2025 | 21/03/2025 |
| Constraints List |
| Paper: Malvern Gazette - Friday |
| Conservation Area 25m buffer: Great Malvern Conservation Area |
| Conservation Area 0 buffer: Great Malvern Conservation Area |
| CIL003 - Main Urban Area |
| Interferometer Area. INFER/7018 - |
| Enforcement Notice Issued Ref: 00/00062/BOC Property: Land At Court RoadMalvernWorcestershireWR14 3BL |
| Water Supply. If Major Application consultation required with Severn Trent (Welsh Water if in Bockleton Parish) |
| SWDP 6: Conservation Area |
| SWDP 2: Development Boundary |
| SWDP 5: Urban - Unsurveyed |
| Neighbourhood Plan: NPA Boundaries |
| Surface Water: 1 in 1000 extent |
| No associated appeals |