| Condition Details / Information Notes |
| The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| Unless where required or allowed by other conditions attached to this permission, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans –
Location Plan 01
Site Plan 19
Site Plan 20D
Elevations 22C
Floor Plans 21D
Car Port 24
Street Elevations 23
Reason: To define the permission. |
| No building operations hereby permitted shall commence until details of the materials to be used in the construction of the external surfaces of the dwelling house hereby permitted have been submitted to and approved in writing by the local planning authority. The details to be
submitted shall include:
- Details of the external materials to be used for the walls, elevations and roofing materials.
- Details of heads, sills, position in wall reveal and any surrounding dressings;
- Details of eaves and verges, decorative brick string courses.
The development shall be carried out using the materials as approved.
Reason - To ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with policy SWDP21.
|
| The Development hereby approved shall not be occupied until the first 5 metres of the access into the development, measured from the edge of the carriageway, has been surfaced in a bound material.
Reason: In the interests of highway safety.
|
| The Development hereby permitted shall not be first occupied until sheltered and secure cycle parking to comply with the Council’s adopted highway design guide has been provided in accordance with details which shall first be submitted to and approved in writing by the
Local Planning Authority and thereafter the approved cycle parking shall be kept available for the parking of bicycles only.
Reason: To comply with the Council’s parking standards.
|
| The Development hereby approved shall not be brought into use until the visibility splays shown on drawing 20D have been provided. The splays shall at all times be maintained free of level obstruction exceeding a height of 0.6m above adjacent carriageway.
Reason: In the interests of highway safety.
|
| The Development hereby approved shall not commence until a Construction Management Plan has been submitted to and approved in writing by the Local Planning Authority. This shall include but not be limited to the following:-
• Measures to ensure that vehicles leaving the site do not deposit mud or other detritus on the public highway;
• Details of site operative parking areas, material storage areas and the location of site operatives facilities (offices, toilets etc);
• The hours that delivery vehicles will be permitted to arrive and depart, and arrangements for unloading and manoeuvring.
• Details of any temporary construction accesses and their reinstatement.
The measures set out in the approved Plan shall be carried out and complied with in full during the construction of the development hereby approved. Site operatives' parking, material storage and the positioning of operatives' facilities shall only take place on the site in locations approved by in writing by the local planning authority.
Reason: To ensure the provision of adequate on-site facilities and in the interests of highway safety.
|
| Drainage arrangements shall be provided to ensure that surface water from the driveway and/or vehicular turning area does not discharge onto the public highway. No drainage or effluent from the proposed development shall be allowed to discharge into any highway drain
or over any part of the public highway.
Reason: In the interests of highway safety in accordance with Policy SWDP21.
|
| Prior to the commencement of development, a scheme of landscaping shall be submitted to and approved in writing by the Local Planning Authority. The landscaping scheme shall include a plan detailing the disposition of planting, cross referenced to a schedule listing the
species, size at time of planting, number of plants proposed or proposed planting density. The plan shall detail the treatment of the roadside hedgerow including the use of native species planting. The approved scheme shall be carried out in accordance with a timetable
submitted to and agreed in writing by the Local Planning Authority and retained thereafter. .
Reason: To ensure the environment of the development is improved and enhanced and does not have an adverse effect on the character and appearance of the area, in accordance with Policies SWDP21 and SWDP25.
|
| Before first occupation of the develoment hereby permitted the following shall be provided on site and their locations and thereafter retained:
- One Woodcrete general purpose bat box, suitable for crevice-dwelling species. They should be at least 3m from the ground and face south or south west. No lighting should be installed in the vicinity of the boxes.
- One Woodcrete cavity nesting bird box with 28mm or 32mm access holes. The access should face away from the prevailing wind.
- One insect shelter should be positioned at the base of a hedge on site. The shelter should be positioned within the vicinity of flowering plants to provide food for butterflies and bees.
Reason: In the interests of bio-diversity, in accordance with policy SWDP 22.
|
| Prior to the occupation of any part of the development hereby permitted details of renewable or low carbon energy generating facilities to be incorporated as part of the development shall be submitted to and approved in writing by the local planning authority. The details shall
demonstrate that at least 10% of the predicted energy requirements of the development will be met through the use of renewable/low carbon energy generating facilities. The approved facilities shall be provided prior to any part of the development hereby permitted being first occupied or in accordance with a timetable submitted to and approved by the local planning authority as part of the details required by this condition.
Reason: To ensure the proposed development includes sufficient renewable/low carbon energy generating facilities to comply with Policy 27.
|
| Prior to the first use/occupation of the development hereby permitted, the details set out in the submitted Water Management Statement shall be fully implemented and remain thereafter.
Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development in accordance with policy SWDP29.
|
| The development hereby permitted shall not be occupied/first used until full details of all surface water drainage systems to serve the development have been submitted to and approved in writing by the Local Planning Authority. The approved drainage works shall be implemented in accordance with the approved details before the first occupation/use of the development hereby permitted and shall be retained thereafter.
Reason: To ensure development does not exacerbate flood risk and deals with surface water run-off from the site in a sustainable manner, in accordance with policies SWDP28, SWDP29 and SWDP 30 of the South Worcestershire Development Plan.
|
| The development hereby permitted should not commence until drainage plans for the disposal of foul and surface water flows have been submitted to and approved by the Local Planning Authority. The scheme shall be implemented in accordance with the approved details before the development is first brought into use.
Reason> To ensure that the development is provided with a satisfactory means of drainage as well as reduce the risk of creating or exacerbating a flooding problem and to minimise the risk of pollution.
|
| Prior to the first occupation of any of the dwellings hereby approved, details of superfast broadband facilities or alternative solutions to serve the dwellings hereby approved shall be submitted to and approved in writing by the local planning authority. The submitted details shall include an implementation programme. The facilities shall be provided in accordance with the approved details.
Reason: To ensure the proposal incorporates satisfactory telecommunication facilities in line with policy SWDP26.
|
| Positive and Proactive Statement. No problems have arisen in dealing with this application. The planning application sought an acceptable form of development consistent with the requirements of relevant policies and material considerations. No amendments or alterations were therefore required and no further positive or proactive action was deemed necessary. |