| Condition Details / Information Notes |
| The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| Unless where required or allowed by other conditions attached to this permission, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents –
- 23003/10 Rev P2 (Location plan)
- 23003/11 Rev P4 (Proposed site plan)
- 23003/12 Rev P11 (Proposed floor plans)
- 23003/13 Rev P10 (Proposed elevations)
- 23003/14 Rev P11 (Proposed elevations)
- 23003/15 Rev P6 (Proposed Roof Plan)
- 23003/16 Rev P1 (Bins, bikes and boundaries)
Reason: To define the permission. |
| No building operations shall progress beyond slab level until details of the materials to be used in the construction of the external surfaces of the building hereby permitted have been submitted to and approved in writing by the local planning authority. The details to be submitted shall include:-
- type, colour, texture, size and design of roofing materials;
- details of the natural stone and mortar to be used externally;
- a precise specification of the proposed external render, including any decorative panels, and a detailed specification of the mix, the number of coats and surface finish to be used;
- external joinery/window details along with architectural details of the proposed external finishes, heads, sills, position in wall reveal and any surrounding dressings (elevational drawings at a minimum scale of 1:20 and vertical sectional drawings at minimum scale of 1:2);
- details of the approved rooflights, including drawings showing finish, materials and low profile design;
- details of any external vents, extracts and chimney flues, including information on specification and colour; and
- details of external doors including information on finish;
- details of the balcony treatment, including materials/finishes.
The development shall be carried out using the materials as approved.
Reason: To protect, conserve and enhance the significance of heritage assets and to ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with Policies SWDP 6, 21 and 24 of the South Worcestershire Development Plan. |
| Before the first use/occupation of the development hereby permitted, a precise specification for the proposed materials for the hard landscaping of the site (including driveways, paths, parking areas and other hard surfaces) shall be submitted to and approved in writing by the local planning authority. The hard landscaping of the site shall be completed before the first use/occupation of the development hereby permitted. Development shall be carried out in accordance with the approved details.
Reason: To ensure the proposed development represents high quality design and does not have an adverse effect on the character and appearance of the area in accordance with Policy SWDP 21 of the South Worcestershire Development Plan. |
| Before the first use/occupation of the development hereby permitted a scheme of landscaping shall be submitted to and approved in writing by the Local Planning Authority. The landscaping scheme shall include:-
(i) a plan(s) showing details of all existing trees and hedges on the application site. The plan should include, for each tree/hedge, the accurate position, canopy spread and species, together with an indication of any proposals for felling/pruning and any proposed changes in ground level, or other works to be carried out, within the canopy spread.
(ii) a plan(s) showing the layout of proposed tree, hedge and shrub planting and grass areas.
(iii) a schedule of proposed planting - indicating species, sizes at time of planting and numbers/densities of plants.
(iv) a written specification outlining cultivation and other operations associated with plant and grass establishment.
(v) a schedule of maintenance, including watering and the control of competitive weed growth, for a minimum period of five years from first planting.
All planting and seeding/turfing shall be carried out in accordance with the approved details in the first planting and seeding/turfing seasons following the completion or first occupation/use of the development, whichever is the sooner.
The planting shall be maintained in accordance with the approved schedule of maintenance. Any trees or plants which, within a period of five years from the completion of the planting, die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species.
Reason: To ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with Policies SWDP 21 and 25 of the South Worcestershire Development Plan. |
| The approved refuse storage facilities shall be implemented prior to the first occupation of the associated development and/or building(s) and retained thereafter.
Reason - To ensure adequate refuse storage facilities are incorporated in the development and in the interests of residential amenity in accordance with policies SWDP21 and SWDP33 of the South Worcestershire Development Plan 2016. |
| Before the first use/occupation of the development hereby permitted a plan indicating the positions, design, materials and type of boundary treatment to be erected shall be submitted to and approved in writing by the local planning authority. The boundary treatment shall be completed before the first use/occupation of the development hereby permitted. Development shall be carried out in accordance with the approved details and thereafter retained in that form.
Reason: To protect the amenities of properties and ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with Policy SWDP 21 of the South Worcestershire Development Plan. |
| Prior to the internal fitting out of the building hereby permitted, a Water Management Statement, setting out water efficiency measures and confirming that the daily non-recycled water use per person will not exceed 110 litres per day, shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall be implemented in accordance with the approved details before the first occupation of the development and retained thereafter.
Reason: To ensure sustainability measures are taken into account in the development in accordance with Policies SWDP 21 and SWDP 30 of the South Worcestershire Development Plan.
|
| Before the first use/occupation of the development hereby permitted, precise details of renewable and/or low carbon energy generation measures shall be submitted to and approved in writing by the Local Planning Authority. The measures shall contribute to at least 10% of the predicted energy requirements of the development. The details to be submitted shall include:-
- the overall predicted energy requirements of the approved development;
- the predicted energy generation from the proposed renewable/low carbon energy measures; and
- an implementation timetable for the proposed measures.
The development shall be carried out in accordance with the approved details.
Reason: To ensure the development supports the delivery of low carbon/renewable energy and safeguards natural resources in accordance with Policy SWDP 27 of the South Worcestershire Development Plan. |
| Prior to the first occupation of any of the dwellings hereby approved, details of superfast broadband facilities or alternative solutions to serve the dwellings hereby approved shall be submitted to and approved in writing by the local planning authority. The submitted details shall include an implementation programme. The facilities shall be provided in accordance with the approved details.
Reason: To ensure the proposal incorporates satisfactory telecommunication facilities in line with Policy SWDP 26 of the South Worcestershire Development Plan.
|
| Temporary fencing for the protection of all retained trees/hedges on site and trees outside the site whose Root Protection Areas fall within the site shall be erected in accordance with BS 5837:2012 (Trees in Relation to Design, Demolition and Construction) before development of any type commences, including site clearance, demolition, materials delivery, vehicular movement and erection of site huts.
Any alternative fencing type or position not strictly in accordance with BS 5837 (2012) must be agreed in writing by the local planning authority prior to the commencement of development.
This protective fencing shall remain in place until the completion of development or unless otherwise agreed in writing with the local planning authority. Nothing should be stored or placed, nor shall any ground levels altered, within the fenced area without the previous written consent of the local planning authority. There shall be no burning of any material within 10 metres of the extent of the canopy of any retained tree/hedge.
Reason: To prevent existing trees/hedges from being damaged during construction work and to preserve the amenities of the locality, in accordance with Policies SWDP 21 and 25 of the South Worcestershire Development Plan. |
| Demolition, clearance or construction work and deliveries to and from the site in connection with the development hereby approved shall only take place between the hours of 08.00 and 18.00hrs Monday to Friday and 08.00 and 13.00hrs on a Saturday. There shall be no demolition, clearance or construction work or deliveries to and from the site on Sundays or Bank Holidays.
Reason: To preserve the amenities of the locality in accordance with Policy SWDP 21 of the South Worcestershire Development Plan. |
| Positive and Proactive Statement. In dealing with this application, the Council has worked with the applicant by providing pre-application advice, seeking further information and amendments to the proposed development following receipt of the application, as well as considering the imposition of conditions. In such ways the Council has demonstrated a positive and proactive manner in seeking solutions to problems arising in relation to the application. |
| The Development hereby approved shall not commence until a Construction Environmental Management Plan has been submitted to and approved in writing by the Local Planning Authority. This shall include but not be limited to the following:-
• Measures to ensure that vehicles leaving the site do not deposit mud or other detritus on the public highway;
• Details of site operative parking areas, material storage areas and the location of site operatives facilities (offices, toilets etc);
• The hours that delivery vehicles will be permitted to arrive and depart, and arrangements for unloading and manoeuvring.
• Details of any temporary construction accesses and their reinstatement.
The measures set out in the approved Plan shall be carried out and complied with in full during the construction of the development hereby approved. Site operatives' parking, material storage and the positioning of operatives' facilities shall only take place on the site in locations approved by in writing by the local planning authority.
Reason: To ensure the provision of adequate on-site facilities and in the interests of highway safety and to comply with Policy SWDP21 of the South Worcestershire Development Plan 2016. |
| The Development hereby approved shall not be brought into use until the access, parking and turning facilities have been provided as shown on drawing 23003-11-P4 Proposed Site Plan.
Reason: To ensure conformity with summited details and in the interests of highway safety to comply with Policy SWDP21 of the South Worcestershire Development Plan 2016. |
| The Development hereby approved shall not be occupied until pedestrian visibility splays of 2m x 2m measured perpendicularly back from the back of footway shall be provided on both sides of the access. The splays shall thereafter be maintained free of obstruction exceeding a height of 0.6m above the adjacent ground level.
Reason: In the interests of highway safety and to comply with Policy SWDP21 of the South Worcestershire Development Plan 2016. |
| The Development hereby permitted shall not be first occupied until sheltered safe, secure and accessible cycle parking to comply with the Council’s adopted highway design guide has been provided in accordance with the approved details. Thereafter the approved cycle parking shall be kept available for the parking of bicycles only.
Reason: To comply with the Council’s parking standards and with Policy SWDP4 of the South Worcestershire Development Plan 2016. |
| The Development hereby approved shall not be occupied until a residential ‘Travel Welcome Pack’ promoting and encouraging sustainable journeys to and from the development has been prepared and distributed to each resident at the point of site occupation. The content of the Travel Welcome Pack is to be approved in writing by the Local Planning Authority in conjunction with the Local Highway Authority.
Reason: To ensure residents of the development site are offered a genuine choice of sustainable travel modes and to promote sustainable access to the development site and to comply with Policy SWDP4 of the South Worcestershire Development Plan 2016. |
| The development hereby permitted shall not be occupied/first used until full details of all surface water drainage systems to serve the development have been submitted to and approved in writing by the Local Planning Authority. The approved drainage works shall be implemented in accordance with the approved details before the first occupation/use of the development hereby permitted and shall be retained thereafter.
Reason: To ensure development does not exacerbate flood risk and deals with surface water run-off from the site in a sustainable manner, in accordance with policies SWDP28, SWDP29 and SWDP 30 of the South Worcestershire Development Plan 2016. |